Search Permits
16,909 results · type: electrical
Panel and meter upgrade
Finish out for Light Manufacturing. Scope does not overlap Phase 1 under 2026-028062 PR
temporary tpole for new construction in Wildhorse 2026 098954 000 00 BP
12x25 Pool with autofill NG heater and ASTM F1346 Automatic safety cover.
Install Valero Hallmark on east end of canopy
ePlan: Commercial Expedited Review - Interior Remodel to Existing Energy X Office Building (2575 SF)
Expedited Review: New Construction of a 2-Story Single Family Res [4bed 4.5bath] with attached Garage and Habitable Attic.
EXPRESS: Bathroom 1: demo nonstructural wall; convert tub to shower; all like for like Bathroom 2: demo nonstructural wall; all like for like
Addition and remodel to existing 1-story single-family residential to include: addition of primary bath and screened porch; primary bedroom extension; interior remodel; Replace all plumbing as required; remove portion of existing driveway to meet impervious calculations.
SMART HOUSING - New Construction of a multi-family fourplex.
ePlan: Expedited Review - [APPROVED] New Construction of a 5-Story Multi-Family Bldg. - Fire Area 2 - contains Level 1 Pool Equipment Room Level 5 Sky Lounge and Terrace (152142 SF). 135 UNITS
Renovation of existing preschool building and 1999 SF addition at rear of property.
Interior remodel - updating cabinets fixtures flooring adding a full bath upstairs
TEMPORARY DISCONNECT/RECONNECT FOR ENPHASE BATTRY
Install temporary pole for construction. Ref: 2025-099683 BP
Bldg 2 New Construction of 2-story SF Res [4bed 4bath] with attached garage
homebuilder loop refer to 2026 - 098301 BP
New Inground Pool
SMART HOUSING - New Construction of a multi-family fourplex.
ePlan: Residential Expedited Review - New construction of an Accessory to Primary [1bed 0.5bath]. 3406 Duval St.
Install Level 2 EV Charger
electrical_permit_(r)
electrical_permit_(r)
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PERMIT IS ONLY FOR THE INSTALLATION OF TWO SIGEN BATTERIES AND ONE POINTGUARD BATTERY PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Install 14kw Generac generator, sub panel, transfer switch, and dedicated gas line. Minimum required building inspection electric final.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY
Install two new dedicated 20 amp circuits. Minimum required building inspections: Electrical final.
New 22kw Generac Generator.