Search Permits
191,479 results
mechanical
plumbing
plumbing
plumbing
building
mechanical
electrical
plumbing
mechanical
building
Replacement of complete existing central heat and air system with or without duct work 1 system: 5 Ton Variable Speed Condenser evaporator coil and gas furnace
Install Irrigation System
SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION. 1-STORY 4 BEDROOM WITH 3 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - First Time Finish out for Office Space.
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. (5) Applications submitted Replace existing lighting fixtures switches and outlets as needed. No new circuits service change.
Little Caesars Channel Letters - Raceway
Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructu
New 1-story single family residence 3 bedroom/2 bathroom with attached garage covered porch and covered patio
The project includes a 400-amp transocket meter mounted on a service rack. 2026-057697 EP is the main electrical permit number. ref BP: 2026-057697 BP
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 2 - involves demolition and renovation of new reception trade room parlor retail and hydration station areas. Finish upgrades to porte cochrere entry elevator lobby and corridor.
temporary t-pole for new construction for Easton Park Ref: 2026-046482 BP
CHANGE OF USE MED OFFICE TO PERSONAL USE FITNESS Finish for Fitness Studio in prior demod space
New construction of SFR Condo with 6 beds 6.5 baths covered patio covered porch and covered front deck with 3 car attached tandem garage
Plumbing for New Construction of SFR in the ETJ 2987 sq ft
Construct new driveway approach of 12 FT. No sidewalk inspection per plan review.
Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1)
CHANGE OF USE from office to dental officeinterior finish-out to add demising walls between existing office suites to create Suite 206 along with an interior remodel
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 01-2049
Disconnect and Reconnect (PEC) - Installation of a 200A Automatic Transfer Switch 24kW whole home generator additional grounding and type 2 surge protection.