PermitDig

Search Permits

11,838 results · type: mechanical

FILING TO OBTAIN CERTIFICATE OF COMPLIANCE FOR UNITS ORIGINALLY FILED AND APPROVED UNDER BIS APPLICATION # 122139934. NO NEW WORK WILL TAKE PLACE, ONLY FILING TO OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.

330 FIFTH AVENUE, Manhattan
10KJul 29

Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

114 BRUCKNER BOULEVARD, Bronx
Jul 29

Installation Of Temporary Single Personnel Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

114 BRUCKNER BOULEVARD, Bronx
Jul 29

CONVERSION OF THE EXISTING ONE AND HALF STORY ONE-FAMILY BUILDING INTO A TWO-STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.

167-36 145 DRIVE, Queens
829KJul 29

CONVERSION OF THE EXISTING ONE AND HALF STORY ONE-FAMILY BUILDING INTO A TWO-STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.

167-36 145 DRIVE, Queens
829KJul 29

INSTALLATION OF (1) 3 TON AC UNIT WITH CONDENSER ON EXTERIOR WALL

404 LAFAYETTE STREET, Manhattan
68KJul 29

Respectfully request to install (3) split ducted central A/C system. No change in use, egress, or occupancy.

303 WEST 80 STREET, Manhattan
41KJul 29

INSTALLATION OF AC UNITS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

211 COURT STREET, Brooklyn
Jul 29

APPLICATION IS FILED FOR THE CONSTRUCTION OF (8) ATTACHED 2-FAMILY 2&3 STORY RESIDENTIAL BUILDINGS WITHIN A NEW (16) UNIT DEVELOPEMENT. ALL WORK AS PER PLANS SUBMITTED HEREWITH.

2212 SOUTH RAILROAD AVENUE, Staten Island
Jul 29

1300 MORRIS PARK AVENUE - FORCHHEIMER & GOLDING LAB RENO - MECHANICAL MODIFICATIONS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

1300 MORRIS PARK AVENUE, Bronx
700KJul 29

Modifications to the existing HVAC system on the 3rd floor as per plans. No change to use, egress or occupancy.

150 FIFTH AVENUE, Manhattan
123KJul 29

A COMMERCIAL SPACE WITH MECHANICAL WORK ON THE FIRST AND CELLAR FLOOR.THIS APPLICATION IS RELATED TO DOB ALT 2 JOB #M01395309-I1.NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

1271 BROADWAY, Manhattan
36KJul 29

INSTALLATION OF 8 TRANE ROOFTOP MOUNTED UNITS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

57-00 49 PLACE, Queens
240KJul 29

(NYC GENERAL CATALYST-12TH FL WEALTH) FILING HEREWITH MECHANICAL PLANS WORK TO INCLUDE MECHANICAL DUCTWORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

148 LAFAYETTE STREET, Manhattan
20KJul 29

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 142

2819 FOSTER LN UNIT 142, AUSTIN
Jul 28

Replacement of complete existing central heat and air system with or without duct work Replace existing 2-ton vertical gas split HVAC system (furnace coil condenser) with new like-for-like Rheem equipment; no structural change.

6509 BRADSHER DR BLDG B, AUSTIN
Jul 28

Replacement of complete existing central heat and air system with or without duct work 2604 Georgia Coleman Bend - Glen

2604 GEORGIA COLEMAN BND, AUSTIN
Jul 28

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.

3712 HIDDEN HOLW, AUSTIN
Jul 28

Interior remodel and garage conversion Interior remodel and garage addition (conversion) to existing sfr including framing modifications new laundry and half bath

2217 INDEPENDENCE DR, AUSTIN
Jul 28

ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (31107 SF)

2900 OLIVARIS BLVD BLDG 1, AUSTIN
Jul 28

Replacement of HVAC system.

4411 ROSEDALE AVE, AUSTIN
Jul 28

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.

3707 GILBERT ST, AUSTIN
Jul 28

ePlan: Commercial Expedited Review - Interior Remodel to Existing Medical Office for 1st floor Area to Create Pharmacy Area (30000 SF)

1101 CAMINO LA COSTA, AUSTIN
Jul 28

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.

12520 ENCHANTED FOREST DR, AUSTIN
Jul 28

Replacement of complete existing central heat and air system with or without duct work 1 system

714 RAMOS ST, AUSTIN
Jul 28

Replacement of complete existing central heat and air system with or without duct work Anna Brauninger: Replace 3-ton like-for-like system

12312 BEDROCK TRL, AUSTIN
Jul 28

Electrical HVAC insulation drywall paint flooring carpet. The house was caught on fire and we are restoring it to pre-loss conditions

1404 MERCHANTS TALE LN, AUSTIN
Jul 28

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.

4708 EVANS AVE, AUSTIN
Jul 28

Replacement of complete existing central heat and air system with or without duct work

7809 VALBURN DR, AUSTIN
Jul 28

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1320

3101 S LAMAR BLVD UNIT 1320, AUSTIN
Jul 28