Search Permits
16,909 results · type: electrical
ePlan: Residential Expedited Review - New construction of a 1-Story Accessory to Primary [1bath]
MEMORIAL MARKER PALMS - IKE KIOSK AUS-035 (Congress Ave & E 10th St)
PALMS - IKE Smart City Kiosk - AUS-018 W 2nd St & San Antonio St
Pre Fabricated Kitchen [Zone D-4] [7 Day Review]
set t pole-2026 054274 BP
Install additional 3.22 kW DC rooftop solar system to existing residential
CHANGE OF USE FINANCIAL SERVICES TO PERSONALSERVICES Interior tenant improvement for Corepower Yoga a training and skill development studio with emphasis on functional fitness and health. Added separately as PR was approved without the MEPs being created.
New single-family residence - 4 bed/2.5 bath 2396 living area with attached garage
BASE: Installing a backup battery system and additional meter socket.
Rebuild Service as meter is faulty and arcing /200 amp underground
MAVIS SIGN C pylon sign
Replace meter can socket internals that are damaged. Replace wire from meter can to tap block in gutter. No ESPA required per Austin Energy.
Run new circuitry from electrical panel for basketball backboards one on either side of the gym and install receptacle on wall for scoreboard
PALMS - IKE KIOSK AUS-013 (W 4th St & Guadalupe St)
Reference 2026-091760 BP for TUP. Provide temporary panel built on strut. Panel will be fed from existing customer panel with a 50A 2P breaker. Temp panel will have a few 20A GFI receptacles to feed customer lighting and equipment under 20x20 tent
Warren - 40-02307 - Disconnect/reconnect power to tie in PV component to MSP to 225 Amps bus / 150 amps Main Breaker. Upgrading revenue meter to 200 Amps. Underground service requesting wire pull only.
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(c)
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY WITH BACK UP SWITCH. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE O
“Installation from 100 to 200 Amp electric service -for units A, B and C no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.”
Upgrade existing 200A SES to new 400A SES underground service. Minimum required building inspections: Electric rough in and electric final.
Install 24kw Generator, sub panel, transfer switch, two 120 gal propane tanks, and dedicated propane line at existing SFR. Minimum required building inspections: Gas underground, gas rough in and gas pipe final.
Put this is the description for SRP plans : "Electrical permit to replace electric service like for like at existing SFR. All repairs are to comply with SRP and City of Mesa codes and requirements. No plans required. Remove existing 100amp double meter pedestal and replace with a new 100amp double meter pedestal for space 122 including space 182 per SRP design. This is one double meter pedestal change out that includes both spaces 122and 182.
electrical
electrical
electrical