PermitDig

Search Permits

11,838 results · type: mechanical

ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (37807 SF)

2900 OLIVARIS BLVD BLDG 12, AUSTIN
Jul 30

1522 SF First tenant Generation Finish Out for a convenience store NO KITCHEN

313 W 17TH ST UNIT 100, AUSTIN
Jul 30

ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (31107 SF)

2900 OLIVARIS BLVD BLDG 9, AUSTIN
Jul 30

*Green Building* New 1-story 3 bedroom 2 bathroom single family residence with attached garage covered front porch and rear covered patio.

8212 PEERLESS PASS, AUSTIN
Jul 30

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.

1023 JUNIPER ST, AUSTIN
Jul 30

ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (37807 SF)

2900 OLIVARIS BLVD BLDG 11, AUSTIN
Jul 30

Replacement of complete existing central heat and air system with or without duct work change out of Lennox 2.0 Ton Merit (Up-Flow) Gas 80%

9711 CURLEW DR, AUSTIN
Jul 30

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.

6804 CORNISH HEN LN, AUSTIN
Jul 30

ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (37807 SF)

2900 OLIVARIS BLVD BLDG 2, AUSTIN
Jul 30

The proposed project of site improvement to an existing multifamily (senior living) community. Work includes selective demolition and replacement of existing sidewalks to provide ADA and TAS compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. An existing storage shed will be removed. Widening existing front porch on HC units only community building. All interior work is contained entirely withing the

808 EBERHART LN BLDG 200, AUSTIN
Jul 30

Replacement of complete existing central heat and air system with or without duct work 5 Ton 2 stage replacement

10716 MAELIN DR, AUSTIN
Jul 30

ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (31107 SF)

2900 OLIVARIS BLVD BLDG 8, AUSTIN
Jul 30

ePlan: Expedited Review - New Maintenance Building (396 SF)

2900 OLIVARIS BLVD BLDG MAINT, AUSTIN
Jul 30

Interior finish out

8001 CIRCUIT OF THE AMERICAS BLVD UNIT 509, AUSTIN
Jul 30

Secondary Mechanical Contractor- Install 4-Ton RTU with duct work

9921 E US 290 HWY SVRD EB BLDG 1 UNIT 100, AUSTIN
Jul 30

ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (31107 SF)

2900 OLIVARIS BLVD BLDG 3, AUSTIN
Jul 30

Construction of a New 3-Story Building to include Science Labs and CTE Spaces Additional Parking and Landscape PuPR2

5600 SUNSHINE DR BLDG J, AUSTIN
Jul 30

The proposed project of site improvement to an existing multifamily (senior living) community. Work includes selective demolition and replacement of existing sidewalks to provide ADA and TAS compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. An existing storage shed will be removed. Widening existing front porch on HC units only community building. All interior work is contained entirely withing the

808 EBERHART LN BLDG 600, AUSTIN
Jul 30

mechanical

2439 JOSEPH GREEN LANE, Norfolk
0KJul 30

mechanical

1045 JAMESTOWN CRESCENT, Norfolk
0KJul 30

mechanical

3901 BEACH AVENUE, Norfolk
0KJul 30

mechanical

3452 MODLIN COURT, Norfolk
0KJul 30

mechanical

7532 DIVEN STREET, Norfolk
0KJul 30

INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

331 MAPLE STREET, Brooklyn
1KJul 30

EQUIPMENT USE: INSTALLATION OF A TEMPORARY PERSONNEL HOIST COMPLEX AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.

343 MADISON AVENUE, Manhattan
10KJul 30

Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

135 WEST 79 STREET, Manhattan
25KJul 30

Installation of temporary needle beams per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

114 BRUCKNER BOULEVARD, Bronx
Jul 30

Install and replace vents, units and exhausts.

535 MADISON AVENUE, Manhattan
500KJul 30

TEMPORARY ROOF/ OVERHEAD PROTECTION AT THE ADJOINING PROPERTY AS PER DRAWINGS. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

300 EAST 42 STREET, Manhattan
7KJul 30

INSTALLATION AND USE OF TEMPORARY OVERHEAD, ROOF AND MECHANICAL PROTECTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OCCUPANCY UNDER THIS APPLICATION.

100 WEST 119 STREET, Manhattan
9KJul 30