Search Permits
11,838 results · type: mechanical
The proposed project of site improvement to an existing multifamily (senior living) community. Work includes selective demolition and replacement of existing sidewalks to provide ADA and TAS compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. An existing storage shed will be removed. Widening existing front porch on HC units only community building. All interior work is contained entirely withing the
ePlan: Expedited Review - New Leasing/Club Building - also contains Mail Business Center Fitness and Bike Room (6836 SF)
New 2-story 3 bedroom 2.5 bathroom single family residence with habitable basement attached carport covered porches and balcony.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4.5bath] with Attached Garage.
ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (37807 SF)
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
The proposed project of site improvement to an existing multifamily (senior living) community. Work includes selective demolition and replacement of existing sidewalks to provide ADA and TAS compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. An existing storage shed will be removed. Widening existing front porch on HC units only community building. All interior work is contained entirely withing the
ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (37807 SF)
Replacement of complete existing central heat and air system with or without duct work.
The proposed project of site improvement to an existing multifamily (senior living) community. Work includes selective demolition and replacement of existing sidewalks to provide ADA and TAS compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. An existing storage shed will be removed. Widening existing front porch on HC units only community building. All interior work is contained entirely withing the
ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (31107 SF)
Interior remodel replace windows upgrade main panel (no exterior work at all we dont touch anything outside) only inside. Convert 85 sqft of garage into interior space.
The proposed project of site improvement to an existing multifamily (senior living) community. Work includes selective demolition and replacement of existing sidewalks to provide ADA and TAS compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. An existing storage shed will be removed. Widening existing front porch on HC units only community building. All interior work is contained entirely withing the
New construction single-family residential 2-story 4 bedroom 3.5 bath with attached 2-car garage covered front porch and covered rear patio.
ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (37807 SF)
*Partial Demo* Addition/interior remodel to single-story SFR
Replacement of complete existing central heat and air system with or without duct work
Retroactively permit existing second unit on single-family lot. Removal of dangerously diseased Hackberry per Preliminary Tree Review.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work hvac change out
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (31107 SF)
ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (31107 SF)
Replacement of complete existing central heat and air system with or without duct work childress
The proposed project of site improvement to an existing multifamily (senior living) community. Work includes selective demolition and replacement of existing sidewalks to provide ADA and TAS compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. An existing storage shed will be removed. Widening existing front porch on HC units only community building. All interior work is contained entirely withing the
Replacement of complete existing central heat and air system with or without duct work 3T gas system replacement
Replacement of complete existing central heat and air system with or without duct work HVAC Replacement
ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (37807 SF)
Express: Replacing windows and/or exterior doors (like for like); fix exterior cracks on stucco walls and paint. Tub/Shower Conversion.
The proposed project of site improvement to an existing multifamily (senior living) community. Work includes selective demolition and replacement of existing sidewalks to provide ADA and TAS compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. An existing storage shed will be removed. Widening existing front porch on HC units only community building. All interior work is contained entirely withing the