Search Permits
16,709 results · type: electrical
Install Level 2 EV Charger
Homebuilders loop for New SFR ref 2026-124024 BP. Austin Full purpose
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
Main panel changeout
Change of Use from Admin Business Office to Medical Office. Large office building - existing space being separated from larger suite. No work scheduled Need new suite number.
THIS IS TO UPGRADE AN OLD FEDERAL PACIFIC PANEL WITH NO MAIN BREAKER TO A NEW PANEL LIKE TO LIKE AND A NEW METER CAN 200 AMPS UP TO CODE SERVICE IS UNDERGROUND
Installation of a 200A Service-Rated Automatic Transfer Switch 26kW whole home generator additional grounding and type 2 surge protection
New construction single-family residential 2-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio.
TEMPORARY TPOLE FOR NEW CONSTRUCTION IN EASTON PARK ref. 2026-036237 BP
Converting an existing bedroom into a primary bathroom and closet. New fireplace in living room.
New pools
Upgrade service to 200a
Home Builder Loop for New SFR COA Ref: 2026-125537 - Bluebonnet
Single Family Residential New Home Construction 2 Story 4 bedroom with 3.5 bathrooms with 3 car garage and covered patio.
ETJ. 16 kW roof mounted solar with energy storage
Installation of a 200A Service-Rated Automatic Transfer Switch 26kW whole home generator additional grounding and type 2 surge protection
[ETJ] New Construction of a SFR
Add new 240V circuit with GFCI and NEMA 14-50 outlet in garage.
Demo and remodel of part of a wood structure office and exterior stair and landing damaged by tree falling on it. Intent is to build back to previous design and condition minor Electrical work signed off on by master electrician. Mechanical review requested for oversight- no mechanical scope.
200 amp OH service replacement
Installing EV charger in the garage.
Homebuilders loop for New SFR ref 2026-101679 BP. Austin Full purpose
New construction of 1 story sfr 4 beds 2 baths 2 car garage covered patio
200 overhead temp service
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(c)
Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
New 125A Main Lug Only Subpanel in rear workshop + 17-ft trench at existing SFR. Reference: COD26-04085 - ramps being used to access workshop at rear.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF