Search Permits
11,838 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work
mechanical
mechanical
mechanical
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
INSTALLATION OF A TEMPORARY ROOF ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ENCLOSURE SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
Installation of temporary crash deck during the Met Tang Wing Addition (filed separately under # M01289549) per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
TEMPORARY PLACEMENT OF A KNUCKLEBOOM TO HOIST MATERIAL
EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING BLDG ALTERATION , FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
APPLICATION BEING FILED TO REPLACE AN EXISTING ROOFTOP HVAC UNIT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
EQUIPMENT USE (CARS 1&2): INSTALLATION OF DUAL 7000# CAPACITY PERSONNEL HOISTS DURING BLDG ALTERATION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT.
INTERIOR & EXTERIOR RENOVATION OF AN EXISTING 2 FAMILY HOUSE WITH , REPAIRING CEILING, NEW PARTITION, DOOR, PAINTING , REPLACE WINDOWS, , REPLACE STAIR, INSTALL NEW AC UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR & EXTERIOR RENOVATION OF AN EXISTING 2 FAMILY HOUSE WITH , REPAIRING CEILING, NEW PARTITION, DOOR, PAINTING , REPLACE WINDOWS, , REPLACE STAIR, INSTALL NEW AC UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL NEW PARTITION AND HVAC ON THE 2ND FLOOR OF EXISTING 5 STORIES BUILDING. PARTITION. FLOORING AND PAINTING THROUGHOUT. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
New split units and new ventless recirculation wall mount hoods for the eating and drinking establishment as per plans ,
FILE MECHANICAL WORK IN CONJUNCTION WITH JOB #: B01229342-I1.
Mechanical changes as indicated on plans.
NEW PARTITIONS, COUNTERTOPS, DOOR, PAINT , AND MECHANICAL DUCTWORK AND NEW SYSTEMS ON EXISTING EATING AND DRINKINGESTABLISHMENT AS PER PLAN FILED HEREWITH, NO CHANGE OF USE,EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
SUB SLAB DEPRESSURIZATION SYSTEM AS PER PLANS SUBMITTED.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system. 2 in total
ePlan: Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (31107 SF)
The proposed project of site improvement to an existing multifamily (senior living) community. Work includes selective demolition and replacement of existing sidewalks to provide ADA and TAS compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. An existing storage shed will be removed. Widening existing front porch on HC units only community building. All interior work is contained entirely withing the
Replacement of complete existing central heat and air system with or without duct work CLAYTON
This project will add a new Cath Lab to existing Surgical Suite on the second floor of the facility. This Cath Lab will require the relocation of the existing pharmacy. A new pharmacy will be built on the fourth level shell space. Additionally a Nuc Med Suite will be added within the existing Imaging Department. This will displace the existing Womens Imaging services which will be relocated to the adjacent MOB shell space. (2 apps - 2 addresses)
New 1-story 3 bedroom 2.5 bathroom single family residence with covered porches.