Search Permits
16,909 results · type: electrical
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Den Covered Porch and Covered Patio. BLDG 2
BASE: Installing a backup battery system and additional meter socket.
New construction of in ground pool concrete deck and equipment pad
Addition of a new covered porch to rear of existing 2-story dwelling unit. Convert 94 sq. ft. of existing covered porch into a conditioned breakfast room. Comprehensive interior remodel. Roll in scope of work from expired BP#: 2009-060220 (Enlarge 2 windows in the master bedroom on the existing single family residence).
Griffin - 40-01171 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 150 amp Main Breaker. Upgrading revenue meter to 200 Amps. Underground service requesting wire pull.
Peterson - 40-03695 - Install new 5.76 kW rooftop solar system to existing residential only using backfed breaker only.
Install new 3.50 kw rooftop solar system for existing residential only.
BASE: Installing a backup battery system and additional meter socket.
Install Level 2 EV Charger
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
1.7 MW roof top PV solar installation with microinverters
Replace wires from the line side of the meter socket to mechanical lugs.
BASE: Installing a backup battery system and additional meter socket.
5.7kw solar system
Install front lit channel letters reading Brake and Tire Since 1968 on south elevation
Installation of a 253.55 kW roof mounted solar PV system. Install includes modules inverters racking and other necessary equipment.
New pool and spa
We will be moving the utility meter onto a rack about 5 away from current location due to the meter not having proper overhead clearance per code.
BASE: Installing a backup battery system and additional meter socket.
change the breaker box from 150 to 200 amps panel
BASE: Installing a backup battery system and additional meter socket.
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2bath] Work to include: Interior remodel Addition of 7sf Partial Garage conversion to create master closet and laundry room.
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res [4bed 4bath]- Extensive Interior Remodel 1st Level Reconfigure. Rework Basement for Addition New Exterior Stair and Rework Existing Pool Layout. adding 1bath
tpole permit for 2026-043775 BP
HOME BUILDERS LOOP for New SFR COA BP: 2026-102518 Bluebonnet
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
Upgrade service to 200a