Search Permits
18,557 results · type: plumbing
Replacement of an existing water heater
ePlan: Residential Expedited Review - New Construction of a 2-Story SF Res [4bed 6bath] with attached garage 8/13/26 Placed on EV hold
Replacement of an existing water heater 4515 AVENUE B WATER HEATER INSTALLATION
Replacement of an existing water heater Install 50g NG Water Heater
Replacing main sewer line installing a yard clean out
Install Sprinkler System
*Green Building* New 2-story 4 bedroom 3.5 bathroom single family residence with attached garage covered front porch and rear covered patio.
Kitchen remodel: relocating side door adding a new window in its place replacing window over sink relocating range and hood moving gas line for range. Move fridge & water line. Replacing all cabinets and adding an island. Remove fur down in kitchen. Raising ceiling to match dining. Enlarge opening at entry hall to 5 new lights switches outlets. 8/17/26 SM - REVISED ** Replace gas line for dryer due to leak in line.
New construction sfr in the etj 2812 sqft
Express- Shower pan and valve replacement
Change Out: Replace 40 gallon natural gas tank-type with 199K BTU natural gas tankless water heater.
Replacement of an existing water heater Replace 50 gallon gas water heater
Convert existing single family 2460 sqft house to a 2-family (single family with ADU-SFR in the rear) property. The original house is 960 sqft (new Bldg 1) 1500 sqft in the rear (new Bldg 2). Only the back 750 sqft downstairs will be modified (add sink and associated plumbing to make the back structure a separate dwelling unit. No work will be completed in the original house or the upstairs in the back. Need 1 additional electric meter (2 total) and NO TAP PLAN.
install full irrigation system to landscape areas using reclaimed water meter
Bldg #2 New 2-story single family residence 3 bed/3 bath with attached garage covered entry porch and covered patio
Move Gas line 25 to reposition stove
*Green Building* New 2-story 4 bedroom 3.5 bathroom single family residence with attached garage covered front porch and rear covered patio.
Cap OFF W/WW Demolition of the Andrews Elementary School building approximately 55471 square feet circa SP-2025-0302CX - Approved
Install outside underground water & wastewater (ending 5 outside of bldg)
Repair of subfloor sanitary sewer system via tunnel excavation.
Install Outside Underground Fireline
Replacement of an existing water heater 50 Gallon Natural Gas Water Heater Replacement
Addition and remodel of existing 2-story single family residence: Addition on second floor above garage includes a guest room office room bathroom and uncovered roof deck. Addition is accessed via a new second stairway and it is walled off from the existing portion of the second floor. Both the new and existing stairway are accessed nearby from the same hallway on the first floor. On the existing first floor a remodel and porch enclosure will include the new stairway and a hallway between th
structural deficiencies in the 2-inch pipe we performed a Cured in Place Pipe (CIPP) rehabilitation of the affected section. This procedure includes scuffing the pipe wall for better adhesion and monitoring the curing process.
New construction of 2 story sfr 5 beds 3.5 baths attached garage
Replace main water line from water meter to the home
11 Tunnel below the foundation to spot repair the hall bath drain line. 1 access hole - right side
Natural Gas Repair for existing generator and connection to new gas meter.
install a full lawn sprinkler system
irrigation install