Search Permits
11,838 results · type: mechanical
BLDG 13 - UNIT C (UNIT 1011 - 1021 1047 - 1052) WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS 1 HALF BATH AND A BALCONY.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacement of 3 ton Complete HVAC system
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Vacant suite prior use medical office. Interior renovation to make a commercial medical spec suite.
New two-story SFR *PRODUCTION BUILDER- GREEN BUILDING* 4 bed 3.5 bath with attached garage front covered porch and rear covered patio
Replacement of complete existing central heat and air system with or without duct work
New 2-story single family residence 3 bedrooms/2.5 bathrooms attached garage with covered porch and patio
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work
New construction of 2 story sfr with 4 beds 3.5 baths opt pm suite 2 with pm bath 2 media room gourmet kitchen and 3 car garage covered entry porch and patio PUD
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work **LUIS PORTILLO: Replace existing 3-ton horizontal gas HVAC system with like-for-like equipment; no structural change.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work **DEBRA LOPEZ: Replacing like for like 2t horz gas: No structural change.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
ePlan: Commercial Expedited Review - Interior Remodel to Existing Emergency Department at Hospital - Phase 2 (1007145 SF)
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
New single-family residence - 3 bed/2 bath 1757 living area with attached garage
1655BL NEW 1 STORY 3 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
7 DAY - New rooftop standby water chiller install at existing warehouse
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - [APPROVED] Phase 1B- Scope of work to Include 3 Middle Sections for the Home side Bottom Row of the Proposed Stadium Seating (273698 SF).
Replacement of complete existing central heat and air system with or without duct work
1548AR NEW 1 STORY 3 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacing AC unit Bridge at Terracina apartment #106
Addition to existing SFR and new ADU
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work