Search Permits
18,557 results · type: plumbing
Gas company shut off gas due to leak at cutoff.
Installation of an RPZ backflow device for a pool
Replacement of an existing water heater 50gal tank electric hybrid
Excavate 37 tunnel to repair main drain line under the house 6809 Esther Drive Austin TX 78752
New construction sfr in the etj 2372 sqft
New Service for SFR in ETJ. 2574 sq ft.
Repair or replace drain pipe and to city main.
New construction of 2 story Duplex Condo each with 3 beds 2.5 baths and attached garage (8024 and 8026 bird song) - Unit B
New construction of 2 story Duplex Condo each with 3 beds 2.5 baths and attached garage (8024 and 8026 bird song) - Unit A
ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas on Floor 1. Phase1-C.
Replacement of 50 gallon LP gas water heater change out 11600 Harpster Bend Austin TX 78717
Interior remodel. Breakroom in an existing office suite.
Replacement of an existing water heater 40 gal water heater change out 5301 Viamonte Lane Austin TX 78739
Estonian 3316 B Left New - 2 Story SFR CONDOMINUM w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 683.96 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 30-4 Actual Bld height: 30-4 required parking: 2.
Estonian 3316 A Left New - 2 Story SFR CONDOMINUM w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 682.41 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 30 Actual Bld height: 30-0 required parking: 2.
Interior Remodel to Existing Warehouse Office
repair sewer line under the slab (via access hole and tunneling)
Replacement of an existing water heater 50 gallon natural gas water heater change out 7125 Quimper Lane Austin TX 78749
Replacement of complete existing central heat and air system with or without duct work 50 gal water heater change out 1602 Perez Street Unit B Austin TX 78721
ePlan Review: Finish out for Warehouse
Replace water line in yard
New construction of a 2-story single family dwelling in a condo regime. 3 Bedrooms 2.5 Bathrooms Attached 2 car garage
New construction sfr in the etj 1720 sqft
8022 New construction of 2 story Duplex Condo each with 3 beds 2.5 baths and attached garage (8020 and 8022 bird song)
35 tunnel below the foundation to repair break on master bathtub and breaks on laundry line 2 access holes - 1 slab penetration in garage and in back. 10 tunnel below the foundation to correct sloping of the kitchen drain line.
Replacement of an existing water heater Replace 50-Gallon Electric Water Heater
Total demo of SFR 880 sqft circa 1947
8022 New construction of 2 story Duplex Condo each with 3 beds 2.5 baths and attached garage (8020 and 8022 bird song)
sewer yard line repair roughly 50ft
Express: Insurance job from a fire that took place. Remediate and remodel.