Search Permits
191,342 results
Express: Tub to shower conversion in hall bathroom Replace walls in shower. Replace Exhaust fan in hall bathroom.
Akins Early College High School - Minor interior renovations site fencing and a new portable classroom building 2025 000114 DA - Pending Electrical was finaled on August 5 2025. I re-opened the electrical permit for additional work from revision to include- Lighting- Relocate 2-2X4 light fixtures relocate occ sensor in waiting area A120 added one 2X4 in corridor and added lighting controls to Office A123 and office A122 in Segment A Level 1. Power- Relocate 1 duplex to Office A12 in Segment A
New 2-story single family residence 5-bed/6.5 bath with attached garage covered patios uncovered deck and rooftop deck
New Construction - 1889 - (Guadalupe 2) - New 2- Story Single Family Home w/ 3 bedrooms 2.5 bathrooms Opt Gourmet Kitchen Covered entry patio and a 2-Car attached garage.
Express- Replace 9 windows with new windows of the same size; like for like install.
Replacement of complete existing central heat and air system with or without duct work
Interior non-structural demolition
Installation of 7 new L2 EV chargers in an existing apartment parking garage.
NEW PHOTOVOLTAIC SYSTEM 176.54KW (DC) 160.00 KW (AC) 364 PANEL
New Single Family residence with 4 bed 2.5 bath and 2 car attached garage
Need to add Home Builders Loop so we can start construction. Active RollingWood Permit 2025-266
Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spaces.Access control plan provided as separate attachments. Existing lighting to be relocated/reused. (Suite 600 615 625 and 635) Spec suite corridor and existing stair infill on level 6 (within unit 635). Building core is existing to remain. Corridor finish refresh. Demo two doors. Access control pla
Construct new driveway approach of 8 FT. No sidewalk inspection per plan review.
Install new 116.82 kWDC rooftop solar system to commercial only.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 322
ETJ-NEW SFR (AW) 2600 square feet Per PC master meter AW
Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spaces.Access control plan provided as separate attachments. Existing lighting to be relocated/reused. (Suite 600 615 625 and 635) Spec suite corridor and existing stair infill on level 6 (within unit 635). Building core is existing to remain. Corridor finish refresh. Demo two doors. Access control pla
Unit B - New construction of Duplex condo each with 3 beds 2.5 baths and attached 2 car garages
T pole for new home build. 2026 063695 000 00 BP Thank you Travis Bade 5127316088
Total demo of Detached garage 495 sq ft circa 1936 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Falcon S404 C Left New - 2 Story SFR w/ 4 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Total demo of duplex 2200 sq ft circa 1966 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
Replacement of complete existing central heat and air system with or without duct work 4-TON CONDENSER CHANGE-OUT & 88K BTU FURNACE CHANGE-OUT
Construct new driveway approach of 16.9 FT
Addition/Interior Remodel - Approx 612 sqft Interior remodel to existing single family adding half bath converting existing garage into new master suite - adding 612 sqft new attached garage
Replacement of complete existing central heat and air system with or without duct work 4-TON CONDENSER CHANGE-OUT & 88K BTU FURNACE CHANGE-OUT
Unit A/Unit 49 - New construction of duplex condo each with 3 beds 2.5 baths and attached 2 car garage
ePlan: Commercial Expedited Review - New Construction of Multi-Family Apartment Buildings due to Fire Damage.
Install new irrigation system for new landscaping in HOA Open Space. REF: 2026-058545 W
Addition and remodel. Total reconfiguring of interior/full interior remodel expand area of new kitchen at rear of structure enclose area under front covered porch to create new entry and breakfast areas increase garage by 3 at opening