Search Permits
11,833 results · type: mechanical
REPLACEMENT OF EXIST. NORTH RETAIL MECHANICAL SYSTEM INCLUDING ROOF AIR CONDENSERS AND INDOOR AIR HANDLER UNITS IN CELLAR AND FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Installation of contractors shanty as per plans filed herewith.
INSTALLATION OF TEMPORARY ROOF PROTECTION OVER ADJACENT PROPERTIES AS PER PLANS. TEMPORARY PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY ROOF PROTECTION OVER ADJACENT PROPERTIES AS PER PLANS. TEMPORARY PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Air conditioning unit replacement on the roof. All existing ductwork to remain. No change in use egress and occupancy.
INSTALLATION OF DUAL PERSONNEL HOISTS. CAR # 1 SHALL BE 6416# & CAR # 2 SHALL BE 7000# CAPACITY DURING NB CONST FILED SEP UNDER # M01231645. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APPL SUB SEP.
INSTALLATION OF TEMPORARY OVERHEAAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PROPOSE PROTECTION & MECHANICAL METHODS PLAN FOR PROPOSED RENOVATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Weather wall on floors 1 -23, as per plans. Filed and fees paid in conjunction with DOBNOW # M01308436-I1. No change to use, egress, or occupancy.
MODIFICATIONS TO EXISTING 36TH FLOOR MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Removal and installation of ductwork. Relocation of existing supply and return diffusers, and relocation of existing thermostats . Installation of new transfer ducts and fire dampers. at unit 34th. No change to use, egress, occupancy.
REMOVE OF MECHANICAL UNIT, DUCT, AND DIFFUSERS AS SHOWN HERWITH, NO CHANGES TO EGRESS, OCCUPANCY OR USE.
Bathroom Exhaust Fans in conjunction with Alt 1 on i1 filing
INSTALL NEW CHIMNEY LINER FOR WOOD BURNING FIREPLACE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
INTERIOR RENOVATION FOR EXISTING RESTAURANT AT 1ST. FLOOR. MECHANICAL AND PLUMBING WORK AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Adding two bedrooms Utility Room/Laundry and a full bathroom to the existing residence by expanding the building footprint along with an interior remodel.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - New Parking Garage - also contains Maintenance.
1155 SF retail tenant expansion of 7013 SF existing retail space. No exterior changes proposed.
Replacement of complete existing central heat and air system with or without duct work 1 system: 4 ton 14 Seer2 Single Stage Condenser evaporator coil and gas furnace
Eastland S352 B Left New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Replacement of complete existing central heat and air system with or without duct work 4 TONS CONDENSER CHANGEOUT INCLUDING INDOOR COIL AND 88K BTUS FURNACE CHANGEOUT 80% HEATER AFUE
Full system replacement
Replacement of complete existing central heat and air system with or without duct work 4.00 Ton Gas System Replacement
Replacement of complete existing central heat and air system with or without duct work Replacement 3 T gas system
ePlan: Commercial Expedited Review - New Apartments -Fire Area 1 Below the 2 Story Podium - also contains Lobby Leasing Live Work Units Dog Wash and Bike Storage and Trash.
Replacement of complete existing central heat and air system with or without duct work Shea Petrick
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work