PermitDig

Search Permits

7,156 results · type: mechanical

Mechanical modifications to include HVAC replacement and replacement of associated ductwork. No change in use, occupancy, or egress.

507 MACDONOUGH STREET, Brooklyn
18KJun 3

INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

109 PRINCE STREET, Manhattan
4KJun 3

HEREWITH FILING FOR NEW MECHANICAL SYSTEMS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

58-50 52 AVENUE, Queens
67KJun 3

INSTALL DEBRIS CHUTE AS PER PLAN IN CONJUNCTION WITH BUILDING DEMOLITION

88 EAST 49 STREET, Brooklyn
6KJun 3

INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

181 MCGUINNESS BOULEVARD, Brooklyn
8KJun 3

MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS IN 26TH FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS

140 EAST 45 STREET, Manhattan
70KJun 3

HH Rad: MODIFICATIONS OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS TO THE RADIOLOGY SUITE WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS.

173 FORT WASHINGTON AVENUE, Manhattan
20KJun 3

Provide mechanical exhaust ventilation for new bathroom as per plans filed

1995 BROADWAY, Manhattan
3KJun 3

MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS IN 11TH FLOOR OFFICE SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS

575 5 AVENUE, Manhattan
75KJun 3

Mechanical ductwork and modifications as per plans filed herewith. No change in use, egress, or occupancy.

218 WEST 18 STREET, Manhattan
115KJun 3

APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 60TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

40 WALL STREET, Manhattan
34KJun 3

Alterations to mechanical system on 43rd floor as per plans. No change to use. egress or occupancy.

30 ROCKEFELLER PLAZA, Manhattan
23KJun 3

Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

260 EAST 72 STREET, Manhattan
3KJun 3

HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.

101 WEST 10 STREET, Manhattan
50KJun 3

Mechanical modifications on the 16-18 Construction/ 17-19 Marketing Fllors as per plans filed herewith. No change in use, egress, or occupancy.

295 5 AVENUE, Manhattan
619KJun 3

INSTALL NEW A/C COMPRESSOR AND ASSOCIATED DUCTWORK

164 LUDLOW STREET, Manhattan
12KJun 3

INSTALL NEW GAS POWER SYSTEM GENERATOR.

1834 EAST 4 STREET, Brooklyn
35KJun 3

Replacement of air conditioning unit on 2nd floor MER. All existing ductwork to remain. No change in use egress and occupancy.

1538 THIRD AVENUE, Manhattan
50KJun 3

INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

291 EASTERN PARKWAY, Brooklyn
6KJun 3

REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS A/C UNIT, AND RELATED MECHANICAL PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS

441 9 AVENUE, Manhattan
83KJun 3

INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

50 SOUTH 2 STREET, Brooklyn
5KJun 3

PROPOSE HORIZONTAL AND VERTICAL ENLARGEMENT FOR A 2-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.

42-35 190 STREET, Queens
1.2MJun 3

HMT Quest: MODIFICATION OF HVAC EQUIPMENT, PIPING AND DUCTWORK TO ACCOMMODATE THE MAKE-UP AIR PROJECT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY

1320 YORK AVENUE, Manhattan
240KJun 3

INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INCLUDING INSTALLATION OF ENERGY RECOVERY VENTILATOR WITH DUCTWORK AND AIR CONDITIONING SYSTEM.

210-15 NORTHERN BOULEVARD, Queens
167KJun 3

TO ERECT TWO STORY ADDITIONS AT FRONT & REAR AND RAISE ATTIC INTO A 2ND FLOOR IN THIS EXISTING 1.5 STORY 1 FAMILY DWELLING AND TO ADD AN ADU. WORK TO INCLUDE THE REMOVAL & INSTALLATION OF STRUCTURAL MEMBERS, PARTITIONS, FENESTRATION & MECHANICAL EQUIPMENT

46-27 195 STREET, Queens
416KJun 3

Installation of HVAC Equipment as per plans filed herewith.

185 AVENUE A, Manhattan
200KJun 3

REPLACEMENT OF AC EQUIPMENT IN THE ROOF LEVEL. NEW AC UNITS TO BE RECONNECT TO EXISTING PIPING AND ELCTRIC. PROTECT ROOFING SYSTEM. ALL AS PER PLAN FILED HEREWITH , NO CHANGE IN USE EGRESS OR OCCUPANCY

73 WEST HOUSTON STREET, Manhattan
50KJun 3

Relocate kitchen exhaust. Reuse existing bathroom exhausts for new bathrooms and laundry as per plans. No change in use, egress or occupancy.

81 IRVING PLACE, Manhattan
36KJun 3

Addition and/or Alterations

3300-20 WALNUT ST, Philadelphia
Jun 3

Addition and/or Alterations

1632 E HEWSON ST, Philadelphia
Jun 3