PermitDig

Search Permits

11,812 results · type: mechanical

INSTALLATION OF NEW HVAC AND ERV SYSTEMS FOR THE HEATING, COOLING, AND VENTILATION OF EACH DWELLING UNIT IN THE BUILDING

56 NEWTON STREET, Staten Island
Aug 7

Contain leaking steam piping, remove existing steam piping and install new steam piping in place.Contain leaking steam piping, remove existing steam piping and install new steam piping in place.

1562 UNIONPORT ROAD, Bronx
20KAug 7

PROPOSED TO INSTALL MINI-SPLIT SYSTEM AND ELEC SPACE HEATERS FOR DWELLING UNITS AS PER PLAN. NO CHANGE IN EGRESS, USE AND OCCUPANCY UNDER THIS APPLICATION.

823 60 STREET, Brooklyn
14KAug 7

INSTALLATION OF KITCHEN- NO CHANGE IN USE/OCCUPANCY, EGRESS UNDER THIS APPLICATION

3209 PHILIP AVENUE, Bronx
12KAug 7

MINOR INTERIOR RENOVATION WORK ON THE EXISTING 2ND-FLOOR DWELLING UNIT. INSTALLATION OF NEW FLOOR TILE AND INSTALLATION OF THREE DUCTLESS MINI-SPLIT HVAC SYSTEMS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY IN THIS APPLICATION.

8631 16 AVENUE, Brooklyn
68KAug 7

Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork

11209 AVERY STATION LOOP, AUSTIN
Aug 6

New construction of 1 story sfr 4 beds 2 baths attached garage and covered patio

10936 TALLSALT DR, AUSTIN
Aug 6

Replacement of complete existing central heat and air system with or without duct work Veronica & Francisco Mejia

4418 DOVEMEADOW DR, AUSTIN
Aug 6

ePlan: Residential Expedited Review - Addition and Remodel to create new 2-story+basement-level duplex from existing 2-Story Single Family Res. New basement-level unit (Unit B) is added in existing basement crawl space & has 2 bedroom 3 bathroom additional bathroom for unit A (existing unit) is added in basement level.

901 POST OAK ST, AUSTIN
Aug 6

Replacement of complete existing central heat and air system with or without duct work HVAC change out

10700 ROY BUTLER DR, AUSTIN
Aug 6

Replacement of complete existing central heat and air system with or without duct work HVAC Changeout/Alteration

7208 HARDY DR, AUSTIN
Aug 6

ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath]. Bldg 2

2716 BRISTOL DR BLDG 2, AUSTIN
Aug 6

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 916

2207 WICKERSHAM LN UNIT 916, AUSTIN
Aug 6

Addition/ remodel to existing 1-story two-unit use residential to include: 1st-floor addition of dining room and utility room; interior remodel to include stairs to new 2nd floor; 2nd-floor addition to include: 1 bedroom 1 bath; new attached 1-car carport.

4906 LYNNWOOD ST, AUSTIN
Aug 6

7 DAY - Interior remodel to existing office area - OVA

7700 W PARMER LN BLDG B, AUSTIN
Aug 6

New construction of 2 story sfr 5 beds 3 baths attached garage

10924 TALLSALT DR, AUSTIN
Aug 6

Interior Remodel of Existing Office Space with Access Control Requested - Phase 1 Phase 2 Phase 3 for Suite 1400 and Phase 1 for Suite 1500)

919 CONGRESS AVE UNIT 1400, AUSTIN
Aug 6

New construction of 1 story sfr

10845 TALLSALT DR, AUSTIN
Aug 6

ePlan: Commercial Expedited Review - Interior Remodel to Existing Office/Warehouse. Modular walls and doors vendor plans included. No racking in scope of work. No access Control in scope of work (62261 SF).

2307 BUSINESS CENTER DR, AUSTIN
Aug 6

Replacement of two existing boilers within the Palmer Events Center

900 BARTON SPRINGS RD, AUSTIN
Aug 6

Replacement of complete existing central heat and air system with or without duct work

6403 CEDRO CV, AUSTIN
Aug 6

Replacement of complete existing central heat and air system with or without duct work

2309 W 9TH ST, AUSTIN
Aug 6

Install an 18K BTU mini split system in the garage.

8609 TORO CREEK CV, AUSTIN
Aug 6

Replacement of complete existing central heat and air system with or without duct work

7200 MONTANA NORTE, AUSTIN
Aug 6

CHANGE OF USE ADM OFFICE TO MEDICAL OFFICE with interior remodel

901 S MOPAC EXPY SVRD NB BLDG 1 UNIT 550, AUSTIN
Aug 6

New construction of 2 story sfr 4 beds 3 baths attached garage

10928 TALLSALT DR, AUSTIN
Aug 6

*Partial Demo* Interior remodel Full interior remodel. kitchen bath bedroom office

8506 ANDREAS CV, AUSTIN
Aug 6

Interior Remodel of Existing Office Space with Access Control Requested - Phase 1 Phase 2 Phase 3 for Suite 1400 and Phase 1 for Suite 1500)

919 CONGRESS AVE UNIT 1400, AUSTIN
Aug 6

MEP and Demising Shell Spaces for Future Tenants (former Frys Big Box) Not For Occupancy

12707 N MOPAC EXPY SVRD NB, AUSTIN
Aug 6

Interior Remodel of Existing Office Space with Access Control Requested - Phase 1 Phase 2 Phase 3 for Suite 1400 and Phase 1 for Suite 1500)

919 CONGRESS AVE UNIT 1400, AUSTIN
Aug 6