Search Permits
16,907 results · type: electrical
Replace existing 200amp outdoor main service and panel with new 200amp main service and panel.
Construction power loop
Install Level 2 EV Charger
New Residential swimming pool with a spa
Remodel admin office
SIGN 3 - Face Lit Channel Letters on Raceway; MEASURING 83.3 SF
Remove and replace existing pool size for size. This project intends to reconstruct the reinforced concrete pool shell due to cracking of the previous shell. The owner intends to limit demolition to the pool shell and plumbing that is encased in the pool shell. Intent is to salvage as much existing equipment as possible.
update panel and meter
Install Level 2 EV Charger
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
PERMIT IS ONLY FOR THE INSTALLATION OF ONE SOLAREDGE BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
electrical
electrical
electrical
electrical
electrical
electrical
electrical
New gunite pool
Interior renovation of five units in a multi-family buildings. Construct fire rated partitions between units. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. [7 Day Review - Multi-Apps. (5)]
Installation for new generac generator and service rated automatic transfer switch. Austin Energy Disconnect will be needed ( Red Oven)
UNIT B: New smaller unit of a duplex 2-story includes the 3-car garage garage apartment with 1 bedroom 1 bath. Part of duplex use.
Installations of a level two EV charger circuit
New Service for a SFR in ETJ.