ETJ new service for SFR
This project includes the partial finish out of existing shell space within the B occupancy MOB in order to expand the existing oncology department. The scope includes additional infusion bags exam rooms offices and support spaces
Interior Remodel of Dental Office for Suite 201
ePlan: Residential Expedited Review - Three Unit - Bldg 1 New Construction of 2-Story SF Res [3bed 2.5bath] w/ attached garage
New pool and spa
New pool and spa
Finish Tenant Out for Masons Meats in ETJ
Replacement of an existing water heater Replace existing 40-gallon natural-gas water heater in patio closet with new 40-gallon unit
New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 9-CB-L. This is a 2 Story building with height of 31-7 and 3129 square feet.
Total demo of SFR 800 sq ft circa 1939 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
ePlan: Residential Expedited Review - New Autofill/Heated pool w/ Spa
Install Outside Underground Fireline
Replacement of sewer line from house to tap connection existing plumbing it has 2 belies and has also come loose at the sewer connection of the sewer .approximately 50ft linear feet. People live in property .
Install approximately 7 linear feet of new exposed gas piping to route and connect the existing gas supply to the designated fixture. Work includes installation of gas piping and necessary fittings/connections.
Total demo of sfr 800 sqft circa 1940
Excavate 65 tunnel to repair main drain line under house 701 Jetta Court Austin TX 78753
Express: tub to tub and a tub to shower conversion
run gas line from attic to kitchen approximately 50 feet
TEMPORARY BUILDING PERMIT: The scope of the permit is limited to site improvements including utilities grading and paving and building foundation (including under-slab utilities). Install site utilities below slab and structural foundation including inspections.
Replacement of an existing water heater Replace existing 50-gallon electric water heater located in garage attic; no structural change.
New Construction of Apartment Complex in the ETJ (sq ft - 34260) 36 Units - 3 Floors
New Construction of Apartment Complex in the ETJ (sq ft - 25284) 24 Units - 3 Floors
New construction multi-family in the etj 33744 sqft 36 units 3 flrs
New construction 2-unit use duplex; Unit A: 2-story 4 bedroom 4 bath with attached 3-car garage covered front porch and covered rear patio.
Replace drain lines under home via tunnel
New Plumbing for SFR in ETJ. 1630 sq ft.
ePlan: Residential Expedited Review - New Construction of a 2-Story SF Res [5bed 4bath] with attached carport
Overlook / Irrigation for new landscape
Plumbing permit to replace existing tub to new shower including new valve and prefabricated acrylic walls in the master bathroom. No structural changes. New installations will tie into existing piping. No change to overall square footage. No other work under this permit. All work to comply with 2024 IRC and 2023 NEC.
PLUMBING PERMIT TO REPLACE SHOWER LIKE-FOR-LIKE. REPLACING PAN, DRAIN, AND VALVES. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.