Search Permits
11,812 results · type: mechanical
mechanical
mechanical
mechanical
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AS PER PLANS. INSTALL REPLACEMENT CHIMNEY EXTENSION AT ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
MECHANICAL MODIFICATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY,
INSTALLATION OF NEW HVAC AND ERV SYSTEMS FOR THE HEATING, COOLING, AND VENTILATION OF EACH DWELLING UNIT IN THE RESIDENCE
DIRECT REPLACEMENT OF (2) EXISTING ROOFTOP UNIT, INSTALL (2) NEW ROOFTOP UNIT FOR FUTURE TENANT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR APARTMENT RENOVATION.
MECH WORK TO REPLACE THE ROOFTOP UNIT WITH NEW ,OBTAIN EQUIPMENT USEPERMIT / LETTER OF COMPLIANCE,NO CHANGE IN USE , EGRESS OR OCCUPANCY.
Replacement of AAon packaged unit
Replacement of complete existing central heat and air system with or without duct work
mechanical
mechanical
Remodel and addition of an existing single family home
Reconstruction of the Pool House with a 430 sf addition. Slab remains from the previous pool house to maintain plumbing in the same locations with the 430 sf addition. New pool equipment shed. Total demo permitted separately (2026-035400 BP)
Replacement of complete existing central heat and air system with or without duct work hvac change out
Replacement of complete existing central heat and air system with or without duct work
*Partial Demo* Interior remodel
Expedited Review - New construction of 2-story duplex [6bed 8bath] with one attached 1-car Garage and one attached 1-car Carport.
Replacement of complete existing central heat and air system with or without duct work HVAC Changeout/Alteration: Replace existing 3-ton vertical heat pump system like-for-like; no structural change.
Replacement of complete existing central heat and air system with or without duct work HVAC change out
Interior remodel. Reconfigure interior layout resulting in a 4 bedroom 3 bathroom single family residence. Remove load bearing wall in kitchen/dining area. Convert portion of existing attached garage into a closet. Replace windows and doors. Replace hot water heater. Replace HVAC and ductwork. Replace electrical and plumbing fixtures. Repair existing rear covered patio. Replace roof shingles.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work Gina Brickey
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.