Search Permits
190,837 results
South pedestal replacement. Removing the existing 150 amp pedestal and installing a new 200 amp pedestal 18-in away from current location per SRP at existing mobile home.
Shower Remodel in Master Bathroom. No structural changes - will tie into existing piping. No change to overall square footage.
Install internally illuminated pan channel letters NAPA AUTO PARTS 40.9 sq ft. Signs shall be installed per NEC 2023 with UL listed components.
DEMOLITION PLANS TIED TO PERMIT PMT26-01380 INTERIOR AND EXTERIOR IMPROVEMENTS
This report identifies permits and documentation required to obtain a permit for removal or restoration of the building to a safe condition. This report is not an appraisal for financial claims. The building inspector may require portions of the building or other debris to be removed to allow evaluation of the damage. Structural shoring and additional lighting may also be required. Before demolition or restoration can begin, an approved method of trash containment and removal must be in place. D
Manufacture and installation of one set of LED lit pan channel letters attached to building 10 sq ft DTA. Signs shall be installed per NEC 2023 with UL listed components.
AFP26-01281 Replacement of 10 automatic transfer switches with 13 automatic transfer switches.
SPACE IS PART OF ONE BIG SPACE SPLIT INTO MULTIPLE. PREVIOUS USE WAS CHURCH WITH KITCHEN. PROPOSED WORK WILL BE TO KEEP EXISTING HOOD AND GAS APPLICANCE BELOW AS WELL AS EXISITNG PLUMBING. NEW EQUIPMENT FOR NEW TENANT WILL BE USED. MINOR ELECTRICAL WORK WITH NEW PENDANT LIGHTS. NO PLUMBING. NO MECHANICAL. NO PLUMBING . NO STRUCTURAL
200 AMP to 400 AMP service upgrade. (1) new electric meter. Reviewed as noted. Results in CoC.
Please do not request inspections under this permit until 2 business days after permit issuance.installation of new speed enforcement traffic equipment on an existing pole. Existing power source to be utilized; no new service required
Please do not request inspections under this permit until 2 business days after permit issuance.Scope includes installation of new speed enforcement traffic equipment on an existing pole. Existing power source to be utilized; no new service required.
Please do not request inspections under this permit until 2 business days after permit issuance.Scope includes installation of new speed enforcement traffic equipment on an existing pole. Existing power source to be utilized; no new service required.
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building