Demo interior partition walls, plumbing fixtures, door frames, doors, ceiling, mechanical ducting, RTUs, lights, and electrical wiring back to meters. Results in CofC.
650 W SOUTHERN AVE, Mesa, AZ
Permit Details
- Permit Number
- PMT26-12147
- Type
- tenant_improvement_(interior_only)
- Status
- issued
- Issued Date
- July 27, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Nate Goegelein
About tenant_improvement_(interior_only) Permits in AZ
0
tenant_improvement_(interior_only) permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Install 2 new underground storage tanks and associated equipment to add diesel fuel pumps at an existing gas station. Diesel tank 15,000-gals and Product X tank 15,000-gals. Remove 3-0 dispensers, replace with 3+1 dispensers 4 each. Approved as Noted. Results in CoC.
3563 E MAIN ST · PMT26-01493
Community Residence registration: Assisted Living Home for 6-10 residents. Sprinkered (in the process of installation)
9804 E SPEED AVE · PMT26-03109
TAYLOR MORRISON #3517 - New 1832 SF single story residence with a 2 car garage and a 2+ car garage option. Built at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs. See MST23-15066 for parcel a,b,d,e of Hawes crossing. Addenda MST25-01482 Add Parcel H & F information: Revised parcel A, D, B & E information. Square footages updated for both MST23-15066 & MST25-01482.
7835 E RENATA AVE · PMT26-03217
TAYLOR MORRISON #3538 - New 2358 SF 2 story residence with a 2 car garage at Hawes Crossing. Includes new water, electric and gas meters. Special inspections for post tension slabs See MST23-15069 for parcel a,b,d,e,at Hawes Crossing. Addenda MST25-01484 - removed jump duct: · added CO/SD detector - Add Parcel H & F - Revise Parcel A & D information -Revise Parcel B & E Information
3754 S PEONIE · PMT26-02666
Similar tenant_improvement_(interior_only) Permits
Tenant improvement combining existing shell Suites 103 and 104 into a 3,269 SF Group M tenant space within an existing Type V-B shell building. Scope includes demolition of the existing demising wall between Suites 103 and 104, construction of a new unisex restroom, interior partitions, mechanical, electrical, plumbing systems, and interior finishes. The existing code-required 1-hour fire-resistance-rated demising wall between Suites 101 and 103 shall remain and be maintained. Deferred submittal
Mesa, AZ · PMT26-13361
A ± 5,996 SQ. FT. Interior Remodel within an existing warehouse in the FujiFilm Facility.
Mesa, AZ · PMT26-13635
Convert a portion of an existing store to a non-air conditioned installation bay area. Includes removing 2 windows and adding overhead doors. See ADM26-00531
Mesa, AZ · PMT26-13621
Office, bathrooms and storage closet are already built out. We will paint, add tile, add pony wall, secure gym equipment to walls. Will hang tvs and audio equipment.
Mesa, AZ · PMT26-13642
UPGRADE EXISTING DISPLAY FREEZER ALCOVE TO ACCOMMODATE A FUTURE SODA FOUNTAIN AND ICE MACHINE, INCLUDING REMOVAL OF EXISTING GYPSUM CEILING, INSTALLATION OF FRP WALL FINISHES, AND PROVISION OF PLUMBING, ELECTRICAL AND MECHANICAL CONNECTIONS PER EQUIPMENT REQUIREMENTS. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND COORDINATE WITH OWNER, VENDOR, AND ALL TRADES TO ENSURE PROPER FIT, FUNCTION AND CODE COMPLIANCE.
Mesa, AZ · PMT26-13614
About tenant_improvement_(interior_only) Permits in Mesa, AZ
What is a tenant_improvement_(interior_only) permit?
A tenant_improvement_(interior_only) permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.