PermitDig
svcRevisions required

Installation of front-lit pan-channel lettering & tagline boxes

1453 S SIGNAL BUTTE RD, Mesa, AZ

Permit Details

Permit Number
PMT26-14419
Type
svc
Status
revisions required
Issued Date
August 20, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Tristan Bails

About svc Permits in AZ

0

svc permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

New 130 SF addition, 247 SF remodel from detached garage to ADU. No upgrade in utilities. Type V-B construction. Deferred truss calculations. Special inspection required for epoxy. Minimum required inspections: Footing, stem, strap/shear, frame, insulation, drywall shear, and final. If needed, underground electrical and plumbing.

131 N PASADENA 101 · PMT26-10839

11053 E. Destination Auto Drive is the correct address and was not selectable. RETAIL INTERIOR TENANT IMPROVEMENT BUILDOUT FOR A PROPOSED VERIZON STORE IN SUITE #3 OF EXISTING SHELL BUILDING IN THE DESTINATION AT GATEWAY DEVELOPMENT. SCOPE TO INCLUDE INTERIOR WALLS, RESTROOM, MEP, AND PAINT. FIXTURE INSTALLATION BY TENANT.

11059 E GATEWAY AUTO DR · PMT26-15818

INSTALL 312 S.F. POOL

3839 E CLOVIS AVE · PMT26-15824

New data center civil site improvements. Installation of all off-site improvements and street frontage landscaping during the first phase of construction. Deferred vehicle access gates.

10437 E ELLIOT RD · PMT26-08422

About svc Permits in Mesa, AZ

What is a svc permit?

A svc permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.