PermitDig
svcRevisions required

Construction and installation of electrical building sign

801 S POWER RD 103, Mesa, AZ

Permit Details

Permit Number
PMT26-13116
Type
svc
Status
revisions required
Issued Date
July 29, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Samata Signs, LLC

About svc Permits in AZ

0

svc permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

Civil improvement plans only. Building by separate permit PMT26-08579 which is in the unassigned civil queue

5118 S 71ST ST · PMT26-10001

Shade cover. Electrical. Building materials will be alumawood and will have steel beam supports and footers. Will NOT be building on fascia of home. And will be in compliance on perimeter standards of HOA.

5414 S VEGAS · PMT26-12305

R-4 OCCUPANCY GROUP CONDITION 1. Community Residence Registration Application and Certificate of Occupancy for a residential care home operating as a Family Community Residence - Behavioral Health Residential Facility. Name: Integrity Youth Homes LLC. Applicant requested 8 number of residents. MZO allows up to 10 residents, excluding staff. No skilled nursing services. 24-hour care. R-4 Occupancy Group Condition 1. MBC 310.5: This occupancy condition shall include buildings in which all persons

3735 E GROVE AVE · PMT26-07932

Provide and install new FACP, replace all notification devices with one for one replacement.

1920 W ISABELLA AVE · PMT26-11987

About svc Permits in Mesa, AZ

What is a svc permit?

A svc permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.