Install (2) Now Leasing banner signs These signs are not portable. They are built on a large frame and secured to the wall to be left for months. (Like a flex face cabinet).
5818 E BASELINE RD 1002, Mesa, AZ
Permit Details
- Permit Number
- PMT26-07764
- Type
- svc
- Status
- revisions required
- Issued Date
- June 30, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Victoria Boardman
About svc Permits in AZ
0
svc permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
COB26-00040 Repairs of fire damaged home. No change to overall square footage. Truss calculations deferred. Special inspections required for drill & epoxy. Minimum required building inspections: Framing and final.
301 W 9TH PL N · PMT26-08445
Tub to Shower in Hall Bathroom at existing SFR - Replace existing wet space with new shower including new valve and prefabricated acrylic walls. No structural changes - will tie into existing piping. No change to overall square footage.
2438 E JEROME AVE · PMT26-11437
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
8056 E MADERO AVE · PMT26-11349
Interior renovation of the Macayou's restaurant at the AZA Airport into a Cold Beer and Cheeseburgers. The work requires demo and rebuild of dining area, new bar and new storage room. Deferred fire sprinklers, fire alarm and hood fire suppression.
6033 S SOSSAMAN RD · PMT26-09126
Similar svc Permits
Install (2) exterior wall mounted illuminated signs with pan channel lettering: FIFTH THIRD BANK w/logo 24.5 sq ft each.
Mesa, AZ · PMT26-09415
Install (1) exterior wall mounted non-illuminated sign Non Illuminated acrylic letters PILATES, 16.6 sq ft.
Mesa, AZ · PMT26-11690
Install two LED illuminated pan channel logo bell signs and LED illuminated pan channel lettersets TACO BELL on the West and North elevations, each 23 sq. ft. one LED illuminated pan channel lettersets and logo bell on East elevation TACO BELL 12 sq. ft. and one LED illuminated pan channel logo bell on the South elevation 14 sq. ft. Also included in permit is two freestanding illuminated menu boards 25 sq. ft. each at the drive thru lane, two drive thru canopies and installation of two clearance
Mesa, AZ · PMT26-06855
Install one (1) LED illuminated pan channel letter sets and logo to front east elevation fascia of suite ACAI BOWLS 47 sq. ft. and one (1) LED illuminated pan channel letter sets on south elevation BERRY DIVINE ACAI BOWLS 39 sq. ft. total 86 sq. ft. Signs shall be installed per NEC 2017 with UL listed components.
Mesa, AZ · PMT25-20357
Install (2) two LED illuminated pan channel letters and logo stud mounted flush to wall on west and north elevations of building THE PICKLR 87 sq. ft. each and replace tenant panels in existing monument signs.
Mesa, AZ · PMT25-05010
About svc Permits in Mesa, AZ
What is a svc permit?
A svc permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.