PermitDig
svcRevisions received

Building Exterior Acrylic letters with backer. No lights

2729 E MAIN ST 103, Mesa, AZ

Permit Details

Permit Number
PMT26-04927
Type
svc
Status
revisions received
Issued Date
July 22, 2026
County
Mesa, AZ
View on county site

Parties

No contractor listed

About svc Permits in AZ

0

svc permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

NEW 1715 SF SINGLE STORY RESIDENCE WITH A TWO CAR GARAGE AT HAWES CROSSING. PLAN HAS A CORNER LOT OPTION. NEW WATER, ELECTRIC AND GAS METERS. SPECIAL INSPECTIONS FOR POST TENSION SLABS. SEE MST23-15241 FOR HAWES CROSSING 2 PARCELS A, B, D AND E. ADDENDA MST25-01481 ADD PARCEL H & F. See permit MST26-07843 for addenda - Code update 2024

8256 E RAMBLEWOOD AVE · PMT26-13207

Relocate existing monument sign back for road widening from 31.1 to 33.6 ft.

1237 S VAL VISTA DR · PMT26-03774

New construction of 1,500 gross SF (1.405 SF net), type VB construction, B occupancy office building to serve outdoor steel fabrication plant workers. Metal framed building with metal siding/roof. Building to include (3) offices,, (1) conference room, (2) breakroom and (3) restrooms. Private utilities extended to building location - civil, structural, mechanical, plumbing electrical. Special inspections req. - steel and post installed concrete anchors. Per approval of ADM25-00709 No rooftop mo

11444 E GERMANN RD · PMT25-22664

TAYLOR MORRISON #4036 NEW 2409 SF OR 2433 SF TWO STORY RESIDENCE WITH A TWO CAR GARAGE AT HAWES CROSSING. INCLUDES WATER, ELECTRIC AND GAS METER. SPECIAL INSPECTIONS FOR STRUCTURAL COMPONENTS AND POST TENSION SLABS. SEE MST23-15591 FOR STRUCTURAL CHANGES AT PARCEL A, B AND E. SHEET E1.1 . ADDENDA MST24-18643 - REVISED LIGHTING AT DINING: SHEET A1.2 REVISED 2050 SH WINDOW TO 2040 SH AT ELEVATION E: SHEETS A1.1 & E1.1 REVISED LOCATION OF A/C UNIT: ADD PARCEL H STRUCTURAL SHEETS TO PLAN SET. REF

3911 S ZINNIA · PMT26-02673

About svc Permits in Mesa, AZ

What is a svc permit?

A svc permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.