Installation of one halo illuminate RPC letters wall sign HONORHEALTH 22.70 Sq Ft.
1840 S STAPLEY DR 101, Mesa, AZ
Permit Details
- Permit Number
- PMT26-03539
- Type
- svc
- Status
- finaled
- Issued Date
- July 10, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Ana Jones
About svc Permits in AZ
0
svc permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Enclose entry porch to add powder room, move interior wall at garage to enlarge dining room, widen previously unpermitted patio cover to extend across back of house, add small attached storage shed and create enclosure for pool equipment. Additions result in 160 S.F. existing under roof remodeled into livable, and newly permitted 415 S.F. non-livable under new roof.
2461 S EXTENSION RD · PMT26-06531
TENANT IMPROVEMENT FOR AN INDOOR GOLF SIMULATOR IN EXISTING SPACE. THE PROJECT SCOPE IS DEMOLISHING EXISTING WALLS, FLOORING, CEILING, LIGHTING, HVAC DUCTWORK AND AIR DEVICES TO PREP FOR NEW GOLF SIMULATION AREAS BY ERECTING NEW INTERIOR WALLS, MECHANICAL AIR DISTRIBUTION AND POWER FOR GOLF SIMULATORS. PLUMBING IS EXISTING TO REMAIN.
2023 W GUADALUPE RD 11 · PMT26-12727
Build 572 SF detached ADU with architectural, and MEP. Meter
1622 W DALE CIR 101 · PMT26-08105
Scope of Work includes review for foundation inspections, structural steel package review, electrical package review and any special inspections for a privately owned substation. Special Inspections are required for concrete, soils, steel, and electrical installations. New typical substation prefabricated metal equipment enclosure, shipped to site in one piece.
7232 E ELLIOT RD · PMT26-08686
Similar svc Permits
Manufacture and install one set of LED illuminated pan channel letters 185 sq ft LOGO FRYS south elevation: removal of current frys sign on east elevation: manufacture and install one set of LED illuminated pan channel letters 32 sq ft PHARMACY south elevation: manufacture and install one set of faces for an existing set of pan channel letters 31 sq ft PHARMACY DRIVE THRU. Signs shall be installed per NEC 2023 with UL listed components. ADM26-00399 sign copy height to increase from five feet i
Mesa, AZ · PMT26-06388
Install exterior illuminated wall signs
Mesa, AZ · PMT26-07599
Remove existing signage and install one illuminated pan channel letter and logo on west elevation FRYS 14 sq. ft. Also included in permit not requiring permit is pan channel logo on south elevation 5 sq. ft. and installing new panels in existing monument sign. Signs shall be installed per NEC 2023 with UL listed components.
Mesa, AZ · PMT26-08532
Remove existing signs and replace with the following. Manufacture and install 2 sets of LED illuminated pan channel letters. 32 sq ft LOGO 58 sq ft FRYS, 32 sq ft PHARMACY. Manufacture and install 1 set of LED face illuminated pan channel letters 22 sq ft STARBUCKS COFFEE. Signs shall be installed per NEC 2023 with UL listed components.
Mesa, AZ · PMT26-08534
Removal of existing signage on fuel canopy and install 3 sets of LED illuminated pan channel logos on South, West and East Elevations. 4.5 sq. ft. each, LED illuminated pan channel letters and logo on North elevation 14 sq. ft. and new digital illuminated fuel center on North elevation of canopy 46 sq. ft. Remove manual price number and reface with LED pricer cabinet. 32 sq. ft. No modifications to existing cabinet or monument sign.
Mesa, AZ · PMT26-06393
About svc Permits in Mesa, AZ
What is a svc permit?
A svc permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.