PermitDig
svcFinaled

Install four LED illuminated wall signs: "DUTCH BROS COFFEE" at the east, north and west elevation, each 28.33 sq. ft each, logo of 18.39 sq. ft. at the North elevation and freestanding menu board with wings sign 21.7 sq. ft. Also included in permit is three non - illuminated directionals 3 sq ft. engineering provided. Signs shall be installed per NEC 2023 with UL listed components.

3406 S ELLSWORTH RD, Mesa, AZ

Permit Details

Permit Number
PMT26-03120
Type
svc
Status
finaled
Issued Date
June 2, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Victoria Boardman

About svc Permits in AZ

0

svc permits in AZ

About svc Permits in Mesa, AZ

What is a svc permit?

A svc permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.