Install a 6 post sail shade structure in a common area on the Cabana Mesa property. REF: PMT23-17445 Mesa offsite improvements + Landscape
515 N MESA DR 101, Mesa, AZ
Permit Details
- Permit Number
- PMT26-12415
- Type
- subdivision_improvements
- Status
- in review
- Issued Date
- August 20, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Sergio Gallardo
About subdivision_improvements Permits in AZ
0
subdivision_improvements permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Group B occupancy. Type ??? construction. 1,150 SF. Occupant load 15. Demo ceiling and identified partition walls. Existing restroom, electrical panels, water heater, and mop sink to remain. Demo existing mechanical ducts, diffusers, and grilles. Existing heat pump RTU to remains. New partition walls to create 2 golf simulator rooms. New mechanical supply air duct, diffusers, and grille. Deferred fire sprinklers. Results in CofO.
2023 W GUADALUPE RD 11 · PMT26-12727
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
4432 E DELTA AVE · PMT26-13550
Interior remodel. Minor interior demolition, new non-bearing walls, type 1 kitchen hood. new restrooms, add sushi bar and relocate plumbing fixtures. New interior finishes. Deferred fire sprinklers, fire alarm, and hood AFES.
1902 E BASELINE RD 5 · PMT26-14235
CONSTRUCT A 512-SF SWIMMING POOL. NO SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY NO.30895, EXPIRES 12-31-26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMEN
7751 E DOWNING ST · PMT26-14427
Similar subdivision_improvements Permits
Hawes Crossing Village 4 is a part of the Hawes Crossing master planned community located northeast quarter of Section 20, Township 1 South, Range 7 East of the Gila and Salt River Meridian. The Project is comprised of approximately 39 net acres planned for single family residential development.
Mesa, AZ · PMT26-10351
Civil improvement plans for new 41 lot subdivision. (1) new 3/4-inch and (2) new 1-inch landscape water meters. (3) new electric meters. Deferred electric vehicle access gate. Results in CoC.
Mesa, AZ · PMT26-04497
New 23-lot residential subdivision.
Mesa, AZ · PMT26-11711
Offsite road improvements for E. Starfire Ave. west of S. Ellsworth Rd.
Mesa, AZ · PMT23-18521
Warner Road improvements west of S. Ellsworth Rd.
Mesa, AZ · PMT23-07916
About subdivision_improvements Permits in Mesa, AZ
What is a subdivision_improvements permit?
A subdivision_improvements permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.