CANNON BEACH - PHASE 1 - ONSITE IMPROVEMENTS NEW TOILET ROOM BUILDING, LIFEGUARD TOWERS , CATWALK, LAGOON EQUIPMENT SHADE STRUCTURE.. PHASE 1 FOR THIS PROJECT COMPRISES OF THE BUILDINGS SUPPORTING THE WAVE LAGOON FUNCTIONS AND ACCESSORY USES (SPECIFICALLY THE TOILET ROOM BUILDING, LIFEGUARD BUILDINGS, AND SUPPORTING STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ENGINEERING FOR THIS SUBMITTAL). THE WAVE LAGOON AND LANDSCAPE ARCHITECTURAL ELEMENTS (INCLUDING SPLASH PAD) WITHIN THE GATES, THE 'B

4503 S POWER RD, Mesa, AZ

Permit Details

Permit Number
PMT20-19377
Type
subdivision_improvements
Status
issued
Issued Date
September 15, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
COLE CANNON

About subdivision_improvements Permits in AZ

0

subdivision_improvements permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

Onsite and Offsite Improvements for Haven at Hawes. Includes (1) 1-inch Pool Meter, (1) 2-inch Landscape Meter and (1) 1" Landscape Meter. 1-inch Domestic services and BFP for each lot, (1) 200 AMP, and (1) 100 AMP electric meter. Deferred electric vehicle gates. Special inspection for post-installed anchors, concrete, and masonry. Reviewed with comments. Results in CoC.

4065 S HAWES RD · PMT26-06671

Install 8-foot iron fence with (5) manual truck gates and (1) pedestrian gate with free egress around loading dock area of existing building. Results in CofC.

2360 W BROADWAY RD 106 · PMT26-09451

Interior renovation of existing cleanroom includes demolition of existing cleanroom wall panels and operable doors with new processing equipment. New clean room area is a required 1-hour fire-rated control area. Includes Architectural, Mechanical, Electrical and Structural Drawings. Special inspection of steel. Deferred fire sprinklers and fire alarm with gas detection. Reviewed as noted. Results in CoC.

730 E BASELINE RD · PMT25-18131

Install storage rack system in an existing warehouse suite. Special inspections required: post-installed anchors. Results in CofC.

2630 N OGDEN 103 · PMT26-07490

About subdivision_improvements Permits in Mesa, AZ

What is a subdivision_improvements permit?

A subdivision_improvements permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.