IN GROUND SPA APRIL PERMIT REPORT BUT DOESNT SPECIFY ON ACTUAL PERMIT.
Unknown, Prosper Town, TX
$50,000
Estimated Value
Permit Details
- Permit Number
- 26-0057
- Type
- spa
- Status
- issued
- Issued Date
- May 23, 2026
- County
- Collin County, TX
Parties
- Property Owner
- ABOULNASR MHD AMMAR & SARA HOJATI
- Contractor
- A&C CONSTRUCTION AND REMODEL
About spa Permits in TX
2
spa permits in TX
$26,173
Average estimated value
Other Permits in Prosper Town, TX
Similar spa Permits
adding a spa seperate from the pool
Mesa, AZ · PMT26-12347
SPA/EQ/HEATER/GASLINE/GENERATOR AND WATER HEATER/50 AMP SUB PANEL. REF. POOL PERMIT 216495 (HOST)
Mesa, AZ · PMT26-11103
CONSTRUCT A 42 SF SPA WITH EXISTING SWIMMING POOL NATURAL GAS HEAT. INSTALLATION OF 109-FT OF 1-1/2-IN PE GAS LINE BURIED 18-IN DEEP WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2018 IFGC & COM GAS REQUIREMENTS.COM GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED OR NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MON
Mesa, AZ · PMT26-03201
NEW SPA ONLY, 64 SQFT;
Murphy City, TX · 26-0501
CONSTRUCT A 38 SF SPA WITH NATURAL GAS HEAT WITH AN EXISTING 331 SF SWIMMING POOL UNDER PERMIT NO. 168703. INSTALLATION OF 30FT OF 1-1/2IN PE GAS LINE BURIED 18" DEEP WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2018 IFGC & SW/COM GAS REQUIREMENTS. SW/COM GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONA
Mesa, AZ · PMT25-20514
About spa Permits in Prosper Town, TX
What is a spa permit?
A spa permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Collin County, TX, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Collin County, TX's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.