permit application to upgrade existing small cell equipment attached to Entergy owned wood pole
1620 Martin Luther King, Jr Blvd, New Orleans, LA
Permit Details
- Permit Number
- new_orleans_la2-1767
- Type
- small_cell_installation
- Status
- issued
- Issued Date
- May 6, 2026
- County
- New Orleans, LA
Parties
No contractor listed
About small_cell_installation Permits in LA
0
small_cell_installation permits in LA
Other Permits in New Orleans, LA
Pressure test and repair leak
4627 Tchoupitoulas St · new_orleans_la2-24753
vacancy inspection
2309 Clouet St · new_orleans_la2-26072
Vacancy permit. Power has been off for more than 6 months. NO ELECTRICAL WORK UNDER THIS PERMIT. THIS PERMIT IS FOR THE PURPOSES OF AN ELECTRICAL VANCANCY FOR 4328 BAUDIN ST.
4328 Baudin St · new_orleans_la2-31300
Upgrade meter pan and two disconnects 200 amps
5 Swan St · new_orleans_la2-38719
Replace damaged underground conduit from Entergy pull box to meter. Emergency reconnect needed 200amps
554 Amethyst St · new_orleans_la2-7311
Similar small_cell_installation Permits
permit application to upgrade existing small cell equipment attached to Uniti Fiber owned wood pole.
New Orleans, LA · new_orleans_la2-93291
permit application to upgrade existing small cell equipment attached to Entergy owned wood pole.
New Orleans, LA · new_orleans_la2-77414
permit application to upgrade existing small cell equipment attached to ATT owned wood pole
New Orleans, LA · new_orleans_la2-32123
permit application to attach small cell equipment to Entergy owned wooden pole
New Orleans, LA · new_orleans_la2-93776
permit application to upgrade existing small cell equipment on Entergy owned wood pole
New Orleans, LA · new_orleans_la2-90189
About small_cell_installation Permits in New Orleans, LA
What is a small_cell_installation permit?
A small_cell_installation permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In New Orleans, LA, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from New Orleans, LA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.