PermitDig
single_family_(detached)Issued

LANDSEA HOMES #35-2300 - RIALTA - Master plan for new 2897 S.F. single-family home construction. New water and electric meters. Special inspections required for post-installed anchors in PT slab and Special Inspection Certificate for Unconfirmed Energy Report Requirements. Truss Calcs deferred. Addenda MST24-21773 - modifications insulation blown in cellulose, vent calculating to reflect the correct number of vents, removed additional attic scuttle/access from garage, structural and mechanical

509 N 89TH PL, Mesa, AZ

Permit Details

Permit Number
PMT25-18259
Type
single_family_(detached)
Status
issued
Issued Date
March 30, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
CHELSEA Martoccia

About single_family_(detached) Permits in AZ

0

single_family_(detached) permits in AZ

About single_family_(detached) Permits in Mesa, AZ

What is a single_family_(detached) permit?

A single_family_(detached) permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.