Lofts @ Pioneer Crossing Homebuilding LLC master plan two-story triplex, R-5 occupancy, one- & two-facility dwelling. Plan1 livable at 1725 and nonlivable at 564, Plan2 livable at 1770 and nonlivable at 574, Plan3 livable at 2055 and nonlivable at 554. Water service 1 inch with 3/4 or 1-inch meter. 200 amp panel electric service. Deferred truss calcs. Fire sprinklers required: submit as an addenda. Special inspection for post tension, epoxy anchors, and soils grading and drainage. EV charger. R
3518 N SUNWOOD, Mesa, AZ
Permit Details
- Permit Number
- PMT25-22139
- Type
- single_family_(attached)
- Status
- c of o issued
- Issued Date
- August 20, 2026
- County
- Mesa, AZ
Parties
- Contractor
- RESERVE 100 LLC
About single_family_(attached) Permits in AZ
0
single_family_(attached) permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
New 1000 SF livable detached ADU above a 1120 SF non-livable RV garage. Type V-B construction. No gas. Existing electrical service size unchanged. 1 inch water meter through Queen Creek Water. Septic system subject to County approved plans with Conditional hold. Deferred truss calculations. No special inspections. Minimum required building inspections: Plumbing underground, footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear, me
8662 E WINNSTON CIR 201 · PMT26-13041
Install new 60-amp circuit for hardwired 48-amp Tesla Wall Connector. Install Tesla inside garage directly behind main electrical panel.
7314 E MADERO AVE · PMT26-13772
TO DECREASE 3 FEET FROM WALL
6441 E QUARTZ ST · PMT26-15499
Lilke for like construction after house fire-complete rebuild
3401 E DOLPHIN AVE · PMT26-15502
Similar single_family_(attached) Permits
Lilke for like construction after house fire-complete rebuild
Mesa, AZ · PMT26-15502
adding battery to existing system
Mesa, AZ · PMT26-13978
adding battery to existing system
Mesa, AZ · PMT26-14480
adding battery to existing system
Mesa, AZ · PMT26-15033
New two-story custom home with 6879 SF livable and 2075 SF non-livable area consisting of garage, garage storage, covered patios, covered porches, covered entries, and HVAC closet. Type V-B construction. New 1.5 inch water meter, new electrical service, and new gas meter. Deferred truss calculations. Special inspections required for soils, steel, concrete, and epoxy anchors. Minimum required building inspections: Plumbing underground, footing, stem, strap/shear, frame, mechanical rough in, elect
Mesa, AZ · PMT25-23693
About single_family_(attached) Permits in Mesa, AZ
What is a single_family_(attached) permit?
A single_family_(attached) permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.