Zen townhouses, Unit 1. Fire sprinklers required and will be submitted as an addenda. New electrical meters. The project is master water metered. The site permit is PMT21-02482
1927 S RECKER RD 113, Mesa, AZ
Permit Details
- Permit Number
- PMT23-10517
- Type
- single_family_(attached)
- Status
- c of o issued
- Issued Date
- July 9, 2026
- County
- Mesa, AZ
Parties
- Contractor
- PACIFIC RIM MESA 2 LLC
About single_family_(attached) Permits in AZ
0
single_family_(attached) permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Demo existing gas fired hot water boilers, storage tanks, expansion tanks, hot water supply, recirculation pumps, and gas piping at East and West buildings. Install new electric boilers, hot water piping, expansion tanks, recirculation pumps, and controls at East and West buildings. Results in CofC.
1520 S DOBSON RD · PMT26-10686
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
1446 E HARMONY AVE · PMT26-12297
COB26-00040 Repairs of fire damaged home. Truss calculations deferred. Special inspections required for drill & epoxy.
301 W 9TH PL N · PMT26-08445
This project consists of 132-units multi-family development comprising of (5) 3-stories multifamily buildings and (1) 1-story clubhouse. BLDG 2: New 3-story, type V-B construction, 28,465 SF, group R-2 occupancy, 24-unit Multifamily building with 2hr fire rated wall to separate building. Special inspection required for steel, concrete, masonry, soils, post install anchors, Fire-resistant Penetrations & Joints, elect equip 1000amps. Deferred submittal - wood trusses. Deferred fire sprinklers
6147 E MAIN ST · PMT26-07252
Similar single_family_(attached) Permits
Zen townhouses, Unit 1. Fire sprinklers required and will be submitted as an addenda. New electrical meters. The project is master water metered. The site permit is PMT21-02482
Mesa, AZ · PMT23-10520
Zen townhouses, Unit 1. Fire sprinklers required and will be submitted as an addenda. New electrical meters. The project is master water metered. The site permit is PMT21-02482
Mesa, AZ · PMT23-10553
Zen townhouses, Unit 1. Fire sprinklers required and will be submitted as an addenda. New electrical meters. The project is master water metered. The site permit is PMT21-02482
Mesa, AZ · PMT23-10555
adding battery
Mesa, AZ · PMT26-11706
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Mesa, AZ · PMT26-11164
About single_family_(attached) Permits in Mesa, AZ
What is a single_family_(attached) permit?
A single_family_(attached) permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.