Overlay existing roofing system apply new PVC fleeceback membrane mechanically attached. Install new perimeter coping metal
9130 15TH PL S, KING COUNTY, WA 98108
$323,093
Estimated Value
Permit Details
- Permit Number
- 7158932-RR
- Type
- roof
- Status
- issued
- Issued Date
- August 19, 2026
- Expires
- February 19, 2028
- County
- Seattle, WA
Parties
- Contractor
- Commercial Industrial Roofing
About roof Permits in WA
558
roof permits in WA
$79,380
Average estimated value
Other Permits in KING COUNTY, WA
Similar roof Permits
Erie to remove existing roofing and properly dispose. Erie to furnish and installice and water shield where applicable.Erie to furnish and install fiberglass dimensional shingle.Erie to furnish and install all accessories that may include drip edge pipe boots and flashing.Erie to vent roof properly.Erie to furnish and install Premium Synthetic Underlayment.Erie to furnish and install decking with OSB where applicable.
SEATTLE, WA · 7164528-RR
We are removing the current composition shingles down to the decking. We are doing the garage and the house. On the home we are installing new 1/2" over the existing ship lap. We will address any rotted decking on the garage and it will be replaced with new 1/2" plywood. We will then install new underlayment and new composition shingles. This is like for like install and no structural changes.
BURIEN, WA · 7164574-RR
Replacing Shingles and TPO at the Woodland Park Zoo South Entry and Zoo Store Complex
SEATTLE, WA · 7164356-RR
reroof like for like with shingles
SEATTLE, WA · 7164308-RR
Tear off asphalt shingle replace sheathing with 1/2" CDX plywood install asphalt shingle roofing system
SEATTLE, WA · 7163666-RR
About roof Permits in KING COUNTY, WA
What is a roof permit?
A roof permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
This permit expires on February 19, 2028.
Where does this data come from?
This permit record comes from Seattle, WA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.