PermitDig
renovation_(non-structural)Issued

Emergency replacement of rear, first floor infill roof only, per attached materials stamped VCC approved 06/23/2026. Remove existing roof membrane, flashing, etc. Install new 3/4" CDX plywood deck; tapered rigid polyiso insulation board + 1 layer of protection board, R-25 min.; taper to slope toward roof drain. Finished TPO surface to be medium gray color, not white. Turn up wall 8" min. and fasten with termination bar and sealant. Flashing and counterflashing to be galvanized. NOTE: Roof

221 Royal St -Apt 402, New Orleans, LA

Permit Details

Permit Number
new_orleans_la2-11420
Type
renovation_(non-structural)
Status
issued
Issued Date
June 25, 2026
County
New Orleans, LA
View on county site

Parties

No contractor listed

About renovation_(non-structural) Permits in LA

0

renovation_(non-structural) permits in LA

About renovation_(non-structural) Permits in New Orleans, LA

What is a renovation_(non-structural) permit?

A renovation_(non-structural) permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In New Orleans, LA, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from New Orleans, LA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.