PLUMBING PERMIT TO REPLACE EXISITING WET SPACES WITH NEW SHOWERS IN MASTER BATHROOOM AND IN HALL BATHROOM, INCLUDING NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
1044 E JENSEN ST, Mesa, AZ
Permit Details
- Permit Number
- PMT26-14793
- Type
- Plumbing
- Status
- fees due
- Issued Date
- August 27, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Katie Weinmann
About Plumbing Permits in AZ
0
Plumbing permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Civil improvement plans only. REF: PMT26-08579 for bldg. Water Meters: (1) 1-inch landscape.
5118 S 71ST ST · PMT26-10001
Demo of existing adjacent 2,500 SF building on site. Remodel of existing 2,470 SF and addition of 2,618 SF of type VB construction, group M occupancy dispensary to include site work. Adjacent suite #38 to be shell space. New plumbing for (1) ADA restroom, (1) standard restroom, mechanical (3) new RTUs and ductwork, new elect meter at exist 600a SES with E-Mon D-Mon meter. Special inspection req. - steel, concrete, masonry, epoxy/expansion anchors. Deferred fire sprinklers. Approved as noted. Res
330 E SOUTHERN AVE · PMT26-02621
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
11131 E UTAH AVE · PMT26-11699
PLUMBING PERMIT TO REPLACE SHOWER LIKE-FOR-LIKE. REPLACING PAN, DRAIN, AND VALVES. USING A SHOWER ROD, NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
7445 E EAGLE CREST DR 1027 · PMT26-11820
Similar Plumbing Permits
plumbing
Norfolk, VA · P26-01602
PLUMBING PERMIT TO REPLACE SHOWER LIKE-FOR-LIKE. REPLACING PAN, DRAIN, AND VALVES. USING A SHOWER ROD, NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Mesa, AZ · PMT26-11820
New Sewer Service - 6419 E Avalon St - County Island
Mesa, AZ · PMT24-06026
INSTALLATION OF 135-FT OF 2-IN PE GAS LINE BURIED 18-IN WITH 18-GAUGE TRACER WIRE FROM GAS METER TO 100K BTU FIREPIT, 30-FT OF 2-IN PE GAS LINE FROM TEE TO 75K BTU BBQ AND 5-FT OF 2-IN PE GAS LINE FROM TEE TO 60K BTU SIDE-BURNER. ALL GAS LINES ARE TO BE INSTALLED PER 2024 IFGC AND SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.
Mesa, AZ · PMT26-14806
PLUMBING PERMIT TUB LINER REPLACEMENT WITH 60 X 30 TUB LINER. NO DRAIN RELOCATION. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Mesa, AZ · PMT26-14755
About Plumbing Permits in Mesa, AZ
What is a Plumbing permit?
A Plumbing permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.