PLUMBING PERMIT TO REPLACE EXISITING WET SPACE WITH NEW SHOWER INCLUDING NEW VALVE AND PREFABRICATED ACRYLIC WALLS IN THE HALL BATHROOM. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
1046 E 2ND ST, Mesa, AZ
Permit Details
- Permit Number
- PMT26-14400
- Type
- Plumbing
- Status
- c of c issued
- Issued Date
- August 28, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Martha Nava
About Plumbing Permits in AZ
0
Plumbing permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
New 130 SF addition, 247 SF remodel from detached garage to ADU. No upgrade in utilities. Type V-B construction. Deferred truss calculations. Special inspection required for epoxy. Minimum required inspections: Footing, stem, strap/shear, frame, insulation, drywall shear, and final. If needed, underground electrical and plumbing.
131 N PASADENA 101 · PMT26-10839
11053 E. Destination Auto Drive is the correct address and was not selectable. RETAIL INTERIOR TENANT IMPROVEMENT BUILDOUT FOR A PROPOSED VERIZON STORE IN SUITE #3 OF EXISTING SHELL BUILDING IN THE DESTINATION AT GATEWAY DEVELOPMENT. SCOPE TO INCLUDE INTERIOR WALLS, RESTROOM, MEP, AND PAINT. FIXTURE INSTALLATION BY TENANT.
11059 E GATEWAY AUTO DR · PMT26-15818
INSTALL 312 S.F. POOL
3839 E CLOVIS AVE · PMT26-15824
New data center civil site improvements. Installation of all off-site improvements and street frontage landscaping during the first phase of construction. Deferred vehicle access gates.
10437 E ELLIOT RD · PMT26-08422
Similar Plumbing Permits
INSTALLATION OF 30-FT OF2-IN PE GAS LINE BURIED 18-IN WITH 14 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.
Mesa, AZ · PMT26-08092
PLUMBING PERMIT TUB LINER REPLACEMENT WITH 60 X 30 TUB LINER. NO DRAIN RELOCATION. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Mesa, AZ · PMT26-14755
PLUMBING PERMIT TO REPLACE EXISITING WET SPACES WITH NEW SHOWERS IN MASTER BATHROOOM AND IN HALL BATHROOM, INCLUDING NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Mesa, AZ · PMT26-14793
PLUMBING PERMIT TO REPLACE EXISITING WET SPACE WITH NEW SHOWER IN MASTER BATHROOOM AND TUB IN GUEST BATHROOM, INCLUDING NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Mesa, AZ · PMT26-14991
PLUMBING PERMIT CONVERTING TUB TO SHOWER. REPLACING PAN, DRAIN, AND VALVES.USING TEMPERED SHOWER DOOR. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC
Mesa, AZ · PMT26-15109
About Plumbing Permits in Mesa, AZ
What is a Plumbing permit?
A Plumbing permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.