INSTALLATION OF 130-FT OF 1-1/4-IN PE GAS LINE BURIED 18-IN WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 95K BTU FIREPLACE, 1-IN PE GAS LINE FEED TO 70K BTU BBQ & 24K BTU DOUBLE SIDE BURNER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.
6157 S ARCHER, Mesa, AZ
Permit Details
- Permit Number
- PMT26-08876
- Type
- Plumbing
- Status
- issued
- Issued Date
- September 24, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Vincent Edwin Kane
About Plumbing Permits in AZ
0
Plumbing permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
1451 E BROWN RD · PMT26-12464
Install canopy over existing Falcon-1 switchgear inside Falcon Substation.
5000 E MCDOWELL RD · PMT26-12849
The project consists of the development of a new shops building and the associated paved access, parking, utility, and drainage infrastructure. No landscape meter. REF: PMT26-11817 Building permit.
9257 E SERENITY AVE · PMT26-12926
Interior alterations to existing Buildings 1, 4, and 5, including remodel of the existing café in Building 1, interior renovations to Buildings 4 and 5, a 24-sf addition to Building 5, and new steel entry canopies at Buildings 4 and 5 totaling 631 sf. Type V-B construction, A-3 occupancy. Building 5 interior separation wall 2-hour fire-resistance-rated assembly to remain, new code required 1-hour corridor in building 5 North. New grease interceptor. Deferred fire alarm. Special inspection requir
2130 E UNIVERSITY DR 5 · PMT26-13047
Similar Plumbing Permits
Run new gas line for a spa heater.
Mesa, AZ · PMT26-16780
plumbing
Norfolk, VA · P26-01768
REMOVE(2) EXISTING HOT WATER BOILER FOR LAUNDROMAT DOMESTIC HOT WATER. REPLACE HOT WATER HEATER AND STORAGE TANK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Manhattan, NY · M01450536-I1-PL
Plumbing filing limited to new plumbing fixtures, sanitary, waste and vent piping associated with the MTA tenant fit-out. New Electric Hot water heaters, no gas piping and no medical gases.
Queens, NY · Q01463998-I1-PL
FILING FOR TWO PIECE BATHROOM IN THE CELLAR AND REMOVE KITCHEN SINK AND SHOWER
Queens, NY · Q01413255-I1-PL
About Plumbing Permits in Mesa, AZ
What is a Plumbing permit?
A Plumbing permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.