PermitDig
permit_-_new_constructionActive

PERMIT EXPIRES ON 10/03/2026 ERECTION STARTS: 8/15/2026, ERECTION ENDS: 8/17/2026. CBC2019 - 2026 SOUTH SHORE SUMMER MOBILE STAGE AT SOUTH SHORE CULTURAL CENTER ON AUG 16, 2026. SET-UP AUG 15 AND TAKEDOWN AUG 17, 2026. 1-24X32 APEX MOBILE STAGE WITH WINGS. SS CHAMBER OF COMMERCE WITH SOUND WORKS PRO.

7059 S SOUTH SHORE DR, Chicago, IL

Permit Details

Permit Number
101086709
Type
permit_-_new_construction
Status
active
Issued Date
August 3, 2026
County
Chicago, IL
View on county site

Parties

Property Owner
SOUND WORKS PRODUCTIONS INC

No contractor listed

About permit_-_new_construction Permits in IL

0

permit_-_new_construction permits in IL

Similar permit_-_new_construction Permits

SPR 2019 CBC: ERECT A NEW 2-STORY (OCCUPANCY GROUP R-5; TYPE VA CONSTRUCTION) SINGLE-FAMILY RESIDENCE WITH BASEMENT AND REAR PATIO. NEW 2-CAR FRAME GARAGE WITH ROOF DECK AND PERGOLA, ACCESS STAIR, NEW 6-FOOT-HIGH WOOD AND 6-FOOT-HIGH IRON FENCING, DETACHED 2 CAR INCLUDING 2 EVSE READY PARKING SPACE FRAME GARAGE ALL WORK AS PER PLANS **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS

Chicago, IL · 101082396

SC 2019 CBC: NEW 4-STORY, 6-UNIT NONSPRINKLERED RESIDENTIAL BUILDING (OCCUPANCY TYPE R-2, TYPE III-B CONSTRUCTION). STRUCTURAL PEER REVIEW.

Chicago, IL · 101088733

SELF CERT 2019 CBC: FIELD REVISIONS TO EXISTING PERMIT #101075380LAYOUTS ADJUSTED TO ALLOW STRUCTURAL BRACED WALLS ACROSS ALL LEVELS. ELECTRICAL AND MECHANICAL PLANS HAVE BEEN UPDATED ACCORDINGLY. WALL TYPES HAVE BEEN UPDATED PER STRUCTURAL PLANS. LOT DIMENSIONS CORRECTED PER SURVEY. ELECTRICAL LOAD CALC ADDED AND WATER SERVICE SIZE ADJUSTED.

Chicago, IL · 101086034

SPR 2019 CBC: ERECT A NEW 2-STORY (OCCUPANCY GROUP R-5; TYPE VA CONSTRUCTION) SINGLE-FAMILY RESIDENCE WITH BASEMENT, ROOF DECK W/PERGOLA AND REAR PATIO. NEW 2-CAR FRAME GARAGE INCLUDES 2 EVSE READY PARKING WITH ROOF DECK WITH ACCESS STAIR AND PERGOLA. NEW 6-FOOT-HIGH WOOD AND 6-FOOT-HIGH IRON FENCING. ALL WORK AS PER PLANS. . **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS

Chicago, IL · 101082394

SELF CERT CBC 2019: NEW 2 STORY SFR WITH BASEMENT/ NEW FRAME GARAGE/ TYPE V-A CONSTRUCTION

Chicago, IL · 101088972

About permit_-_new_construction Permits in Chicago, IL

What is a permit_-_new_construction permit?

A permit_-_new_construction permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Chicago, IL, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Chicago, IL's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.