ADDITION SPC G86. REF. PM SET PMT26-09820
4860 E MAIN ST G86, Mesa, AZ
Permit Details
- Permit Number
- PMT26-11179
- Type
- park_model_other_addition
- Status
- revisions received
- Issued Date
- July 30, 2026
- County
- Mesa, AZ
Parties
- Contractor
- CAL-AM CONSTRUCTION SERVICES
About park_model_other_addition Permits in AZ
0
park_model_other_addition permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Fabricate & Install (1) Non-Illuminated Aluminum Panel
540 W IRON AVE 111 · PMT26-11569
Provide and install new FACP, replace all notification devices with one for one replacement.
1920 W ISABELLA AVE · PMT26-11987
Modifications to existing ANSUL System for proper coverage of existing tilt skillet in kitchen of an existing indoor amusement building. Adding 1 new 1.5 gallon cylinder, 1 new 3N nozzle over Tilt Skillet. System and hood are all existing. Results in CofC.
1830 E BASELINE RD · PMT26-12341
Construction of 275 sq ft livable addition with attached 82 sq ft storage under new awning with ceiling joists, electric and plumbing for bathroom, washer/dryer on raised deck. 200 sq ft parking area and 127 sq ft covered deck and awning. Type V-B construction. No deferred items. No special inspections. Awning engineering provided by Carl Putnam, No. 39702, expires 9-30-27. Minimum of one 9-ft x 18-ft unobstructed paved parking space required behind front setback on 2-in asphalt or 4-in concrete
4860 E MAIN ST G51 · PMT26-11411
Similar park_model_other_addition Permits
Construction of 275 sq ft livable addition with attached 82 sq ft storage under new awning with ceiling joists, electric and plumbing for bathroom, washer/dryer on raised deck. 200 sq ft parking area and 127 sq ft covered deck and awning. Type V-B construction. No deferred items. No special inspections. Awning engineering provided by Carl Putnam, No. 39702, expires 9-30-27. Minimum of one 9-ft x 18-ft unobstructed paved parking space required behind front setback on 2-in asphalt or 4-in concrete
Mesa, AZ · PMT26-11411
Construction of 297 sq ft livable addition under awning with ceiling joists, electric and plumbing for bathroom, washer and dryer on raised deck and 138 sq ft covered deck and awning. Minimum of one 9-ft x 18-ft unobstructed paved, 2-in asphalt or 4-in concrete, parking space required behind front setback. 33.5-ft x 49.5-ft interior corner lot. Minimum setbacks are 5-ft front measured from edge of asphalt, 3-ft rear, 0-ft pm side & 3-ft awning or carport side. Accessory structure roof areas do n
Mesa, AZ · PMT26-11290
ADDITION OF 88 SQ FT LIVABLE SPACE, ADDED 13 SQ FT STORAGE SPACE TO EXISTING ADDITION UNDER EXISTING AWNING WITH CEILING JOISTS, ELECTRIC AND PLUMBING FOR WASHER/DRYER AT GROUND LEVEL. ADDITION OF 71 SQ FT UNCOVERED DECK TO EXISTING DECK. MINIMUM OF ONE 9-FT X 18-FT UNOBSTRUCTED PAVED PARKING SPACE REQUIRED BEHIND FRONT SETBACK ON 2-IN ASPHALT OR 4-IN CONCRETE. INTERIOR CORNER LOT. MINIMUM SETBACKS ARE 4-FT FRONT APPROVED UNDER BOA25-00403, 5-FT REAR, 0-FT PM SIDE, 3-FT AWNING OR CARPORT SIDE. A
Mesa, AZ · PMT26-09585
Build new addition with a total area of 516 sq ft. 396 sq ft of living area and 120 sq ft of storage and laundry area.
Mesa, AZ · PMT26-12285
Build room addition with elect and plumb on raised deck.
Mesa, AZ · PMT26-11589
About park_model_other_addition Permits in Mesa, AZ
What is a park_model_other_addition permit?
A park_model_other_addition permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.