PermitDig
other_commercialFees due

Construction activities are not restricted in general, but outside noise attributed to construction is limited to the following hours: Regular Hours (October 16 – April 30) · Monday–Friday: 6:00 a.m. to 8:00 p.m. (5:00 a.m. for concrete pouring) Summer Hours (May 1 – October 15) · Monday–Friday: 5:00 a.m. to 7:00 p.m. (4:00 a.m. for concrete pouring) · Saturday: 7:00 a.m. to 7:00 p.m. Work that generates noise outside of these hours requires approval and an after-hours permit. After-hours

311 W MAIN ST, Mesa, AZ

Permit Details

Permit Number
PMT26-17245
Type
other_commercial
Status
fees due
Issued Date
September 24, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
SHAYNE SOMMERS

About other_commercial Permits in AZ

0

other_commercial permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

1451 E BROWN RD · PMT26-12464

Install canopy over existing Falcon-1 switchgear inside Falcon Substation.

5000 E MCDOWELL RD · PMT26-12849

The project consists of the development of a new shops building and the associated paved access, parking, utility, and drainage infrastructure. No landscape meter. REF: PMT26-11817 Building permit.

9257 E SERENITY AVE · PMT26-12926

Interior alterations to existing Buildings 1, 4, and 5, including remodel of the existing café in Building 1, interior renovations to Buildings 4 and 5, a 24-sf addition to Building 5, and new steel entry canopies at Buildings 4 and 5 totaling 631 sf. Type V-B construction, A-3 occupancy. Building 5 interior separation wall 2-hour fire-resistance-rated assembly to remain, new code required 1-hour corridor in building 5 North. New grease interceptor. Deferred fire alarm. Special inspection requir

2130 E UNIVERSITY DR 5 · PMT26-13047

Similar other_commercial Permits

About other_commercial Permits in Mesa, AZ

What is a other_commercial permit?

A other_commercial permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.