PermitDig
other_commercialRevisions received

Demo of existing adjacent 2,500 SF building on site. Remodel of existing 2,470 SF and addition of 2,618 SF of type VB construction, group M occupancy dispensary to include site work. Adjacent suite #38 to be shell space. New plumbing for (1) ADA restroom, (1) standard restroom, mechanical (3) new RTUs and ductwork, new elect meter at exist 600a SES with E-Mon D-Mon meter. Special inspection req. - steel, concrete, masonry, epoxy/expansion anchors. Deferred fire sprinklers. Approved as noted. Res

330 E SOUTHERN AVE, Mesa, AZ

Permit Details

Permit Number
PMT26-02621
Type
other_commercial
Status
revisions received
Issued Date
July 10, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Kevin Kerpan

About other_commercial Permits in AZ

0

other_commercial permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

1846 S 24TH ST · PMT26-11076

NEW 1970 SF SINGLE STORY RESIDENCE WITH 2+ CAR GARAGE IN HAWES CROSSING. INCLUDES NEW WATER, GAS AND ELECTRIC METER. SPECIAL INSPECTIONS FOR POST TENSION SLABS. ADDENDA MST22-18751 - PARCEL ADDITION, SHEET S1.01 ADDED PARCEL H INFORMATION: · REVISED GEOTECHNICAL REPORT DATES: SHEETS S1.07 -S1.12 - ADDED SHEETS FOR 9 1/2" FOUNDATION FOR PARCEL F. See permit MST26-07852 for addenda - Code update 2024.

7948 E RAMBLEWOOD AVE · PMT26-12207

UNAUTHORIZED CONSTRUCTION. To restore the structure to livable condition following fire damage. The roof structure above the main livable spaces to be replaced with like for like construction. Truss calculations deferred.

7324 E CLOVIS AVE · PMT26-04172

INTERIOR DENTAL TENANT IMPROVEMENT OF AN EXISTING UNOCCUPIED BUILDING SPACE. THIS IS REMODEL FOR A DENTAL OFFICE . PROVIDE NEW NON-LOAD BEARING PARTITIONS, NEW ELECTRICAL, MECHANICAL, AND PLUMBING. NEW FINISHES. Deferred fire sprinklers.

1116 S STAPLEY DR 108 · PMT26-11186

About other_commercial Permits in Mesa, AZ

What is a other_commercial permit?

A other_commercial permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.