International Residential Code
Block 86.02 Lot 37, Deptford, NJ
Permit Details
- Permit Number
- 20260693+A
- Type
- new
- Status
- permit
- Issued Date
- June 24, 2026
- County
- New Jersey (statewide), NJ
Parties
No contractor listed
About new Permits in NJ
0
new permits in NJ
Other Permits in Deptford, NJ
Similar new Permits
Construct southwest detached garage and accessory structure per plan. (Allow one new detached accessory dwelling unit and accessory structure per land use code with existing single family to remain). Construct one new one-family dwelling and accessory structure per plan. Review and processing for two records under 7099617-CN.
SEATTLE, WA · 7118478-CN
Construct new one-family dwelling (SFR2) per plan. (Establish use as housing for two detached dwelling units per land use code. Existing detached dwelling to remain (SFR1). Construct two new one-family dwellings per plan. Review and processing for 2 records under 7127600-CN.)
SEATTLE, WA · 7127600-CN
Construct new one-family dwelling (SFR3) per plan. (Establish use as housing for two detached dwelling units per land use code. Existing detached dwelling to remain (SFR1). Construct two new one-family dwellings per plan. Review and processing for 2 records under 7127600-CN.
SEATTLE, WA · 7136333-CN
Construct northeast new one family dwelling per plan. (Allow one new detached accessory dwelling unit and one new accessory structure per land use code with existing single family to remain). Construct one new one family dwelling per plan. Review and processing for two records under 7099617-CN)
SEATTLE, WA · 7099617-CN
Install minor communication "small cell node" utility pole (Verizon) per plan.
SEATTLE, WA · 7148933-CN
About new Permits in Deptford, NJ
What is a new permit?
A new permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In New Jersey (statewide), NJ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from New Jersey (statewide), NJ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.