Site work for a new 394-unit apartment complex with associated parking and landscape facilities and perimeter walls. All buildings are in PMT23-04433. Approved with stipulations.
5818 E BASELINE RD, Mesa, AZ
Permit Details
- Permit Number
- PMT23-03959
- Type
- multi-family_residential
- Status
- c of c issued
- Issued Date
- June 24, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Curtis Burnett
About multi-family_residential Permits in AZ
0
multi-family_residential permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
COB26-00162: Fire loss upstairs exhaust fan in hall bathroom at existing SFR. To rebuild like for like per engineer's report and approved USAA insurance scope of repairs. Truss calculations deferred. No change to square footage. Minimum required building inspections: Electrical and final per Rich Lemcke damage inspection.
4843 E DIXON ST · PMT26-07564
New data center civil site improvements. Installation of all off-site improvements and street frontage landscaping during the first phase of construction. Water Meters: (1) 2-inch Landscape meter. Deferred vehicle access gates. REF: PMT26-08422 Bldg 2. Approved with comments. Results in CoC.
10437 E ELLIOT RD · PMT26-08422
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 16-FT X 56-FT 2025 CAVCO MANUFACTURED HOME ABOVE GROUND SET, SERIAL NO. CAV2130AZ25-27386A, WITH A/C ON THE SIDE. NO GAS. ONE 13-FT X 40-FT AWNING PER ICCESR 1398. ACCESSORY STRUCTURE ROOF AREAS DO NOT EXCEED THE 100% MH FLOOR AREA. ACCESSORY STRUCTURES SHALL BE REMOVED WITHIN 60 DAYS OF REMOVAL OF THE MH. PER SECTION 11-34-2(B) OF THE MESA ZONING ORDINANCE, AMENDED IN JULY 2025. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM OF
9310 E MAIN ST 33 · PMT26-09714
Install (2) non-illuminated monuments signs. Results in CofC.
4517 S POWER RD · PMT26-12384
Similar multi-family_residential Permits
8 Units added to existing 7 units on Dana Ave.
Mesa, AZ · PMT26-18066
New 5-story, 36-unit multifamily apartment building with associated site improvements including parking, accessible routes, site lighting, trash enclosure, sidewalks, striping, and signage. Civil, utility, drainage, and landscape improvements are under separate approved permits and are excluded from this building permit scope. REF: PMT26-03590 Approved Civil/ Landscape Plans. Installation of all off-site improvements and street frontage landscaping during the first phase of construction. Specia
Mesa, AZ · PMT26-11181
Demo (1) existing 4 pack electrical meter pack. Install (1) new APS 4 pack electrical meter pack and (2) ground #4 rods with bare copper.
Mesa, AZ · PMT26-15867
Provide and install emergency radio communications enhancement system with a distributed antenna system. Antennas to be mounted on cable tray above ceiling. BDA to be monitored by fire alarm system. Battery backup to supply 24hrs of 100% system operation capacity.
Mesa, AZ · PMT26-15695
Building 11: 3-story, type V-B construction, 25,273 SF, group R-2 occupancy and 3,976 SF, group U occupancy. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Deferred fire alarms and access control. Results in CoO. Ref: PMT24-07220 for primary permit.
Mesa, AZ · PMT24-18712
About multi-family_residential Permits in Mesa, AZ
What is a multi-family_residential permit?
A multi-family_residential permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.