PermitDig
mobile_home_other_additionRevisions required

Mobile home room addition. 12ft by 44ft. Livable area in the front and the rest as storage. Truss calculations deferred. MH set PMT24-07582.

2150 N SILVERTON ST, Mesa, AZ

Permit Details

Permit Number
PMT25-09951
Type
mobile_home_other_addition
Status
revisions required
Issued Date
July 6, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Martin Fernandez J.

About mobile_home_other_addition Permits in AZ

0

mobile_home_other_addition permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

Enclose entry porch to add powder room, move interior wall at garage to enlarge dining room, widen previously unpermitted patio cover to extend across back of house, add small attached storage shed and create enclosure for pool equipment. Additions result in 160 S.F. existing under roof remodeled into livable, and newly permitted 415 S.F. non-livable under new roof.

2461 S EXTENSION RD · PMT26-06531

TENANT IMPROVEMENT FOR AN INDOOR GOLF SIMULATOR IN EXISTING SPACE. THE PROJECT SCOPE IS DEMOLISHING EXISTING WALLS, FLOORING, CEILING, LIGHTING, HVAC DUCTWORK AND AIR DEVICES TO PREP FOR NEW GOLF SIMULATION AREAS BY ERECTING NEW INTERIOR WALLS, MECHANICAL AIR DISTRIBUTION AND POWER FOR GOLF SIMULATORS. PLUMBING IS EXISTING TO REMAIN.

2023 W GUADALUPE RD 11 · PMT26-12727

Build 572 SF detached ADU with architectural, and MEP. Meter

1622 W DALE CIR 101 · PMT26-08105

Scope of Work includes review for foundation inspections, structural steel package review, electrical package review and any special inspections for a privately owned substation. Special Inspections are required for concrete, soils, steel, and electrical installations. New typical substation prefabricated metal equipment enclosure, shipped to site in one piece.

7232 E ELLIOT RD · PMT26-08686

Similar mobile_home_other_addition Permits

CONVERT EXISTING 274 SQ FT SCREEN ROOM INTO ARIZONA ROOM WITH ELECTRIC UNDER EXISTING AWNING ON SLAB. NO PLUMBING. REFERENCE HOST PERMIT 200352 FOR MH SET WITH ACCESSORY STRUCTURES - AWNINGS, CARPORT AND SCREEN ROOM. REFERENCE HOST PERMIT 200353 FOR THE GARAGE. NO OTHER ACCESSORY STRUCTURES UNDER THIS PERMIT. MINIMUM TWO 9-FT X 18-FT PAVED UNOBSTRUCTED PARKING SPACES ON 2-IN ASPHALT OR 4-IN CONCRETE REQUIRED BEHIND FRONT SETBACK WITH A MINIMUM OF ONE COVERED. MINIMUM SETBACKS FOR THIS INTERIOR L

Mesa, AZ · PMT26-05472

Remodel park model including new 36 SF wood deck, exterior stucco, windows and door replacement, and raise deck floor height. Additionally, construct 92 SF shed with electric and plumbing for washer, dryer and bathroom. Ref: COB26-00136.

Mesa, AZ · PMT26-07588

remove existing carport and build back new carport with a storage and laundry room area that is already existing

Mesa, AZ · PMT26-05959

CONSTRUCTION OF 352 SQ FT GARAGE ADDITION UNDER EXISTING AWNING WITH CEILING JOISTS AND ELECTRIC. MINIMUM OF TWO 9-FT X 18-FT UNOBSTRUCTED PAVED, 2-IN ASPHALT OR 4-IN CONCRETE, PARKING SPACE REQUIRED BEHIND FRONT SETBACK WITH A MINIMUM OF ONE COVERED. 58-FT X 77-FT INTERIOR LOT. MINIMUM SETBACKS ARE 7-FT FRONT, 10-FT REAR, 5-FT SIDES. ACCESSORY STRUCTURES DO NOT EXCEED 100% OF THE MH FLOOR AREA. ACCESSORY STRUCTURES SHALL BE REMOVED WITHIN 60 DAYS OF REMOVAL OF THE MH. PER SECTION 11-34-2(B) OF

Mesa, AZ · PMT26-07944

Add additional living area on existing park model

Mesa, AZ · PMT26-11692

About mobile_home_other_addition Permits in Mesa, AZ

What is a mobile_home_other_addition permit?

A mobile_home_other_addition permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.