PermitDig
Mechanical/HVACIn review

Permit for a residential split heat-pump replacement completed August 25, 2025, at 5844 E Fountain Street. Replaced an existing approximately 2.5-ton outdoor unit and indoor air handler with a Goodman 3-ton heat pump, model GLZS5BA3610AA, and matched air handler, model AMST42CU1300. Reused the existing refrigerant line set. Replaced the outdoor 30-amp disconnect with another 30-amp disconnect. Existing breaker and electrical panel were unchanged. Outdoor equipment minimum circuit ampacity increa

5844 E FOUNTAIN ST, Mesa, AZ

Permit Details

Permit Number
PMT26-17160
Type
Mechanical/HVAC
Status
in review
Issued Date
September 23, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Jason Manger

About Mechanical/HVAC Permits in AZ

0

Mechanical/HVAC permits in AZ

About Mechanical/HVAC Permits in Mesa, AZ

What is a Mechanical/HVAC permit?

A Mechanical/HVAC permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.