CHANGE OF USE ADMIN OFFICE TO MEDICAL OFFICE PHARMACY with interior remodel. Initial discussions with AFD indicate no hazmat required. Emails included. Structural verification letter included. No access control
2727 EXPOSITION BLVD UNIT 100, AUSTIN, TX 78703
Permit Details
- Permit Number
- 2026-123975 MP
- Type
- mechanical_permit
- Status
- active
- Issued Date
- October 8, 2026
- Expires
- April 7, 2027
- County
- Austin, TX
Parties
No contractor listed
About mechanical_permit Permits in TX
0
mechanical_permit permits in TX
Other Permits in AUSTIN, TX
Homebuilders loop for New SFR ref 2025-149862 BP. Austin LTD -Bluebonnet
9404 GAMBOL DR · 2026-097741 EP
Homebuilders loop for New SFR ref 2025-146573 BP. Austin LTD -Bluebonnet
17110 RADIANT DR · 2026-097732 EP
Installation of 9.68KW Solar PV system.
6310 LATIGO PASS · 2026-125603 EP
New In ground pool w/ autofill or heat system
200 THE CIRCLE · 2025-057698 PP
SMALL PROJECT - Remodel existing retail space into new retail space.
11200 LAKELINE MALL DR UNIT K · 2026-124545 BP
Similar mechanical_permit Permits
Replacement of complete existing central heat and air system with or without duct work
AUSTIN, TX · 2026-133396 MP
Replacement of complete existing central heat and air system with or without duct work
AUSTIN, TX · 2026-131418 MP
Replacement of complete existing central heat and air system with or without duct work replacement of an hvac system
AUSTIN, TX · 2026-131797 MP
Replacement of complete existing central heat and air system with or without duct work hvac change out
AUSTIN, TX · 2026-131928 MP
Replacement of complete existing central heat and air system with or without duct work
AUSTIN, TX · 2026-131397 MP
About mechanical_permit Permits in AUSTIN, TX
What is a mechanical_permit permit?
A mechanical_permit permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
This permit expires on April 7, 2027.
Where does this data come from?
This permit record comes from Austin, TX's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.