Wiring new construction.
3513 Third St, New Orleans, LA
Permit Details
- Permit Number
- new_orleans_la2-84083
- Type
- electrical_service_/_circuit_/_feeder
- Status
- issued
- Issued Date
- June 27, 2026
- County
- New Orleans, LA
Parties
No contractor listed
About electrical_service_/_circuit_/_feeder Permits in LA
0
electrical_service_/_circuit_/_feeder permits in LA
Other Permits in New Orleans, LA
Pressure test and repair leak
4627 Tchoupitoulas St · new_orleans_la2-24753
vacancy inspection
2309 Clouet St · new_orleans_la2-26072
Vacancy permit. Power has been off for more than 6 months. NO ELECTRICAL WORK UNDER THIS PERMIT. THIS PERMIT IS FOR THE PURPOSES OF AN ELECTRICAL VANCANCY FOR 4328 BAUDIN ST.
4328 Baudin St · new_orleans_la2-31300
Upgrade meter pan and two disconnects 200 amps
5 Swan St · new_orleans_la2-38719
Replace damaged underground conduit from Entergy pull box to meter. Emergency reconnect needed 200amps
554 Amethyst St · new_orleans_la2-7311
Similar electrical_service_/_circuit_/_feeder Permits
Upgrade meter pan and two disconnects 200 amps
New Orleans, LA · new_orleans_la2-38719
Replace damaged underground conduit from Entergy pull box to meter. Emergency reconnect needed 200amps
New Orleans, LA · new_orleans_la2-7311
Run dedicated circuit for EV Charger Install
New Orleans, LA · new_orleans_la2-14950
Service upgrade. Original panel is a fuse type. Will replace meter and service head 125 amp panel for 3427 Republic St
New Orleans, LA · new_orleans_la2-28231
Install 100 amp service with 14 circuit
New Orleans, LA · new_orleans_la2-81589
About electrical_service_/_circuit_/_feeder Permits in New Orleans, LA
What is a electrical_service_/_circuit_/_feeder permit?
A electrical_service_/_circuit_/_feeder permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In New Orleans, LA, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from New Orleans, LA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.