Electric for portable spa and pergola can lights(Pergola under seperate permit PMT26-15875)
2655 E VIRGINIA ST, Mesa, AZ
Permit Details
- Permit Number
- PMT26-16299
- Type
- Electrical
- Status
- submitted
- Issued Date
- September 7, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Joel Parron
About Electrical Permits in AZ
0
Electrical permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
RELATED TO COD26-00357 Add a half circular driveway, a side driveway for the RV gate. Move rear entry gate to the face of the house. Fill in the rear wall.
2437 E ENCANTO ST · PMT26-08198
add 12' x 11' Golf cart addition and 30' x 11' patio cover
1006 S ST PAUL · PMT26-15498
Remove and Replace 2 existing Pylon signs with new signs the same size, and Remove 3 existing building signs and Install new ones.
4353 E MAIN ST · PMT26-16295
adding battery to existing system
2135 W PLATA AVE · PMT26-15894
Similar Electrical Permits
electrical
Norfolk, VA · E26-02420
electrical
Norfolk, VA · E26-02441
electrical
Norfolk, VA · E26-02427
electrical
Norfolk, VA · E26-02380
1303 W Pecos Ave Mesa AZ 85202 200 amp electrical capacity w SRP, confirmed by SRP Installing the following 50 amp charger: ChargePoint - Home Flex Level 2 EV Charger NACS, Hardwired EV Fast Charge Station - Hardwired NACS
Mesa, AZ · PMT26-16289
About Electrical Permits in Mesa, AZ
What is a Electrical permit?
A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.