PermitDig
ElectricalC of c issued

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

712 N DATE, Mesa, AZ

Permit Details

Permit Number
PMT26-11458
Type
Electrical
Status
c of c issued
Issued Date
August 3, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
EMPOWER ELECTRIC INC

About Electrical Permits in AZ

0

Electrical permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

Civil improvement plans only. Building by separate permit PMT26-08579 which is in the unassigned civil queue

5118 S 71ST ST · PMT26-10001

New 2309 SF single story residence with a 2+ car garage at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs - SEE ADDENDA MST25-07605 - See permit MST26-08011 for addenda - Code update 2024.

3905 S HONEYSUCKLE CIR · PMT26-12348

Fabricate & Install (1) Non-Illuminated Aluminum Panel

540 W IRON AVE 111 · PMT26-11569

New 7,024 gray shell building, 2,800 SF patio, and 567 SF canopies (10,391 SF total) for future B, A, and M occupancies. New 1000A 3 phase electrical meter, gas meter, and 1,500 gallon grease interceptor. (5) new mechanical heat pump RTUs. New civil, structural, architectural, MEP, and Fire Protection (fire alarm and fire sprinklers). Deferred submittal: wood trusses. Special inspections required: Electrical performance test, concrete construction, steel construction, fabricated items, post-inst

1337 S SIGNAL BUTTE RD · PMT26-07593

Similar Electrical Permits

PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES

Mesa, AZ · PMT26-11742

PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES AND ONE EXPANSION PACK. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SC

Mesa, AZ · PMT26-11795

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLAPOWERWALL EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT

Mesa, AZ · PMT26-11330

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

Mesa, AZ · PMT26-11706

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

Mesa, AZ · PMT26-12520

About Electrical Permits in Mesa, AZ

What is a Electrical permit?

A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.